My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord89 2004
RedwoodCity
>
City Clerk
>
Ordinances
>
1980-1989
>
1989
>
Ord89 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:32:51 PM
Creation date
10/6/2004 9:25:41 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Date
12/4/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> · DES:d;k 11/07/89 (029/7) <br /> DES:<. ~ 11/13/89R <br />discretion, engage the services of a consulting civil or <br />structural engineer to assist in the evaluation of such <br />documents. <br /> The costs of reviews of such documents by City <br />personnel or consultants, as the case may be, shall be borne <br />by the owner(s) of the unreinforced masonry building or <br />buildings which are the subject of such documents. For <br />purposes of this Section, the Council shall, by resolution, <br />establish a schedule of fees for the recovery of such costs <br />incurred by the City. Said fees shall be payable at the <br />time of submittal of any engineering reports or letters of <br />intent, based upon the applicable hourly rate or rates set <br />forth in the aforementioned schedule of fees times the <br />estimated hours required for such review, as determined by <br />the Building Official. In the event such review requires <br />more time than originally estimated, an additional fee shall <br />be required or, in the event less time is required than that <br />originally estimated, the Building Official shall refund an <br />amount corresponding to the reduction in time, based upon <br />the aforesaid schedule of fees. <br /> Upon submittal for review, all engineering reports and <br />letters of intent shall be deemed public documents. Any <br />deficiencies or discrepancies, or comments with respect to <br />any engineering report or letter of intent resulting from <br />such review shall be noted in writing and retained by the <br />Building Official with the report or letter to which they <br />pertain. <br /> 13 <br /> 2004 <br />-- .' --_.._'"...._-~''',,'"~--_.~_._'~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.