Laserfiche WebLink
EXHIBIT B3 <br />2215 EL CAMINO REAL, REDWOOD CITY <br />STORM WATER MAINTENANCE EXHIBIT <br />0VERFL0W STRUCTURE, <br />72" DIAM DOME GRATED <br />AREA DRAIN <br />6" PONDING DEPTH <br />2' (MIN) FREEBOARD ---1 <br />SLOPE <br />T <br />S17E ICURB <br />PAWANG CUT <br />d <br />°d�llll III <br />Z <br />b <br />° <br />c <br />I <br />4" PERFORATED <br />UNDERDRAIN SLOPED A T <br />0.59 MIN. PERFORA77ONS <br />DOWN. CONNECT TO <br />STORM DRAIN. <br />4 <br />PLANTER <br />CURB TO <br />BOTTOM OF <br />ROCK LAYER, <br />TYPICAL BOTH <br />SIDES <br />Q 4 <br />\7 <br />CAL TRANS <br />CLASS 2 <br />PERMEABLE <br />MA TERIAL <br />SECTION A -A <br />BIO -RETENTION AREA DETAIL <br />NTS <br />ATTY/AGR.2017.009/2215 EI Camino Real - Chevron <br />BIO -SOIL MIX PER <br />APPENDIX I" OF THE <br />SAN MATEO C.3 <br />TECHNICAL GUIDANCE. <br />SIDEWALK, <br />CURB AND <br />GUTTER <br />v o <br />4 <br />d d <br />