Laserfiche WebLink
V. Summary of Inspections and Maintenance: <br />Summarize the following information using the attached Inspection and Maintenance Checklists: <br />Identifying Date of Operation and Maintenance Activities Additional Comments <br />Number of Inspection Performed and Date(s) Conducted <br />Treatment <br />Measure <br />A. Sediment Removal: <br />Total amount of accumulated sediment removed from the stormwater treatment measure(s) during <br />the reporting period: cubic yards. <br />How was sediment disposed? <br />❑ landfill <br />❑ other location on-site as described in and allowed by the maintenance plan <br />❑ other, explain <br />VII. Inspector Information: <br />The inspections documented in the attached Inspection and Maintenance Checklists were conducted <br />by the following inspector(s): <br />Inspector Name and Title <br />Inspector's Employer and Address <br />ATTY/AGR.2017.009/2215 EI Camino Real - Chevron <br />