My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-04-03 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-04-03 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 10:44:41 AM
Creation date
3/30/2017 4:41:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/3/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Greystar El Camino & Diller, Redwood City, CA <br />DPM Modeling - Rail Line Information and DPM and PM2.5 Emission Rates <br />Caltrain Electrification and Diesel-Powered Freight Trains <br />DPM Emission Rates <br />Year Description No. Lines <br />Link <br />Width <br />(ft) <br />Link <br />Width <br />(m) <br />Link <br />Length <br />(ft) <br />Link <br />Length <br />(miles) <br />Link <br />Length <br />(m) <br />Release <br />Height <br />(m) <br />No. <br />Trains <br />per Day <br />Train <br />Travel <br />Speed <br />(mph) <br />Average Daily <br />Emission Rate <br />(g/mi/day) <br />Average Daily <br />Emission Rate <br />(g/day) <br />Link <br />Emission <br />Rate <br />(g/s) <br />Link <br />Emission <br />Rate <br />(lb/hr) <br />2020 Caltrain North - Stop at Station 1 12 3.7 504 0.10 153 5.0 61 10 860.3 82.1 9.50E-04 7.54E-03 <br />Caltrain North - Skip Station 1 12 3.7 504 0.10 153 5.0 14 40 50.3 4.8 5.55E-05 4.40E-04 <br />Passenger - Caltrain South 1 12 3.7 1,864 0.35 568 5.0 75 40 265.3 93.7 1.08E-03 8.61E-03 <br />Freight Trains 1 12 3.7 2,368 0.45 722 5.0 4 40 25.6 11.5 1.33E-04 1.06E-03 <br />Total 1 12 3.7 2,368 0.45 722 5.0 154 -1201.5 192.0 2.22E-03 1.76E-02 <br />2021-2025 Caltrain North - Stop at Station 1 12 3.7 504 0.10 153 5.0 10 10 122.2 11.7 1.35E-04 1.07E-03 <br />Caltrain North - Skip Station 1 12 3.7 504 0.10 153 5.0 9 40 25.5 2.4 2.81E-05 2.23E-04 <br />Passenger - Caltrain South 1 12 3.7 1,864 0.35 568 5.0 19 40 56.0 19.8 2.29E-04 1.82E-03 <br />Freight Trains 1 12 3.7 2,368 0.45 722 5.0 4 40 21.0 9.4 1.09E-04 8.63E-04 <br />Total 1 12 3.7 2,368 0.45 722 5.0 42 -224.6 43.3 5.01E-04 3.97E-03 <br />2026-2035 Caltrain North - Stop at Station 1 12 3.7 504 0.10 153 5.0 3 10 16.4 1.6 1.81E-05 1.43E-04 <br />Caltrain North - Skip Station 1 12 3.7 504 0.10 153 5.0 0 40 0.0 0.0 0.00E+00 0.00E+00 <br />Passenger - Caltrain South 1 12 3.7 1,864 0.35 568 5.0 3 40 4.1 1.4 1.67E-05 1.33E-04 <br />Freight Trains 1 12 3.7 2,368 0.45 722 5.0 4 40 11.6 5.2 6.02E-05 4.78E-04 <br />Total 1 12 3.7 2,368 0.45 722 5.0 10 -32.0 8.2 9.50E-05 7.54E-04 <br />2036-2049 Caltrain North - Stop at Station 1 12 3.7 504 0.10 153 5.0 3 10 6.8 0.6 7.49E-06 5.94E-05 <br />Caltrain North - Skip Station 1 12 3.7 504 0.10 153 5.0 0 40 0.0 0.0 0.00E+00 0.00E+00 <br />Passenger - Caltrain South 1 12 3.7 1,864 0.35 568 5.0 3 40 1.7 0.6 6.93E-06 5.50E-05 <br />Freight Trains 1 12 3.7 2,368 0.45 722 5.0 4 40 4.9 2.2 2.56E-05 2.03E-04 <br />Total 1 12 3.7 2,368 0.45 722 5.0 10 -13.4 3.5 4.00E-05 3.18E-04 <br />Notes:Emission based on Emission Factors for Locomotives, USEPA 2009 (EPA-420-F-09-025) <br />Average emissions calculated for periods 2020, 2021-2025, 2026-2035, and 2036-2049. <br />Fuel correction factors from Offroad Modeling Change Technical memo, Changes to the Locomotive Inventory, CARB July 2006. <br />PM2.5 calculated as 92% of PM emissions (CARB CEIDERS PM2.5 fractions) <br />After 2025 it is assumed that on an annual average basis there would be 4 diesel train trips per day between San Francisco and San Jose. <br />Passenger trains assumed to operate for <br />Freight trains assumed to operate for <br />Caltrain Diesel Trains- with electrification <br />2020 2021 - 2025 2026 - 2049 <br />Arrive/Depart Station <br />Stop at <br />Station <br />Skip <br />Station Total <br />Stop at <br />Station <br />Skip <br />Station Total <br />Stop at <br />Station <br />Skip <br />Station Total <br />Passenger trains - weekday = 72 20 92 12 12 24 4 0 4 <br />Passenger trains - weekend = 32 0 32 4 0 4 0 0 0 <br />Passenger trains - Sat only = 4 0 4 4 0 4 0 0 0 <br />Total Trains =108 20 128 20 12 32 4 0 4 <br />Annual average daily trains =61 14 75 10 9 19 3 0 3 <br />Locomotive horsepower = 3285 (before 2021)3285 (before 2021)3285 (before 2021) <br />3467 (2021 and later)3467 (2021 and later)3467 (2021 and later) <br />Locomotives per train =1 1 1 <br />Locomotive engine load = 0.6 0.6 0.6 <br />Freight <br />Freight trains per day = 4 7 days/week 4 7 days/week 4 7 days/week <br />Locomotive horsepower = 2300 2300 2300 <br />Locomotives per train =2 2 2 <br />Total horsepower =4600 4600 4600 <br />Locomotive engine load = 0.6 0.6 0.6 <br />Locomotive DPM Emission Factors (g/hp-hr) <br />Train Type <br />2019- <br />2020 <br />2021- <br />2025 <br />2026- <br />2035 <br />2036- <br />2048 <br />Passenger 0.101 0.0808 0.039 0.016 <br />Freight 0.111 0.0904 0.050 0.021 <br />* average emissions for period. <br />PM2.5 to PM ratio =0.92 <br />DPM to PM ratio =1 <br />CARB Fuel Adj Factor <br />2010 2011+ <br />Passenger 0.717 0.709 <br />Freight 0.851 0.840 <br />24 hours per day <br />24 hours per day <br /> <br />8.A. - Page 106
The URL can be used to link to this page
Your browser does not support the video tag.