My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Zayo Group, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Zayo Group, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 8:41:02 AM
Creation date
4/3/2017 8:40:38 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Zayo Group, LLC
PROJECT NAME
Installation of Fibre Optic Facilities
RMP File Number
304.5
Date
3/30/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fails to remove or relocate the facilities within the prescribed time period, City may remove the <br />facilities at the expense of Company, and Company shall promptly reimburse the City for any and <br />all expenses, including administrative, legal and consultant costs, within thirty (30) days after <br />receiving an invoice from the City. Any removal or relocation work by Company shall only be done <br />pursuant to an encroachment permit. All of the foregoing shall be subject to all applicable rules, <br />requirements and procedures of the California Public Utilities Commission. <br />6.2 Abandonment of Facilities. If any portion of the Facilities laid, installed, or <br />constructed in the Public Rights -of -Way, other than redundant Facilities or Facilities for emergency <br />use, are no longer used by Company or are abandoned for a period in excess of six (6) months, <br />Company must notify the City Engineer and promptly submit all necessary applications for permits <br />prior to commencing work to vacate and remove the Facilities. Alternatively, the City may allow <br />Company, in its sole discretion, to abandon the Facilities, or any part thereof, in place and convey <br />the Facilities to the City. <br />6.3 If Company fails to remove the Facilities as required by the City pursuant to Section <br />6.2, the City may, in its sole discretion, after providing written notice to Company (a) remove the <br />Facilities at Company's sole expense, which expense Company shall promptly reimburse to the City <br />within thirty (30) days after receiving an invoice for such expenses, including all administrative, legal <br />and consultant costs or (b) deem the Facilities, or any part thereof, to have been abandoned and <br />conveyed to the City. <br />6.4 Repair of Public Rights -of -Way. Whenever the removal or relocation of facilities <br />is required under this Agreement or the Code, Company shall promptly repair and return the Public <br />Rights -Of -Way and adjacent property to a safe and satisfactory condition to the City in accordance <br />with the Code and with the construction -related conditions and specifications established by the City <br />according to its standard practice. If Company removes any Facilities from the Public Rights -Of - <br />Way, company shall, within ten (10) days after such removal, give notice thereof to the City <br />specifying the Right -Of -Way affected and the location thereof as well as the date of removal. <br />Company agrees to promptly complete all restoration work and to promptly repair any damage <br />caused by such work at its sole cost and expense. If Company fails to do so, the City shall have the <br />option to perform such work at Company's sole expense, which expense Company shall promptly <br />reimburse to the City within thirty (30) days after receiving an invoice for such expenses, including <br />all administrative, legal and consultant costs. Before proceeding with removal or relocation work, <br />the Company shall obtain an encroachment permit from the City. <br />ARTICLE 7 <br />DAMAGES <br />7.1 The Company shall be responsible for any damage to the City's street pavements, <br />existing utilities, curbs, gutters, sidewalks due to its installation, maintenance, repair, or removal <br />of its Facilities in the Public Rights -Of -Way and public utility or service easements, and shall <br />repair, replace, and restore in kind the said damaged facilities atits sole expense. <br />7.2 If any Public Right -Of -Way to be used by the Company has preexisting <br />installation(s) placed in said Right -Of -Way, the Company shall assume the responsibility to verify <br />the location of the preexisting installation and notify the City and any third party of the Company's <br />proposed installation. The cost of any work required of such third party or the City to provide <br />ATiY/AGR/2017.03S/ZAYO GROUP, LLC — FIBER OPTIC FACILITIES <br />REV: 02-14-17 JS <br />Page 8 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.