Laserfiche WebLink
04/03/2017 <br />shall be obtained prior to the commencement of construction of the road, <br />utilities, or any site improvements. ][ENGINEERING] <br />a. Work in the City public right-of-way, easements or property in which the <br />City holds an interest. <br />b. Work requiring a grading permit. Grading permits require a Plot and <br />Finished Grading Plan prepared by a California -registered Civil <br />Engineer. <br />c. Work requiring on-site shoring which affects the public right-of-way. <br />d. Work using the public right-of-way for any fixed structure (awnings, roof <br />overhangs, fixed planters, etc.). Insurance, meeting the City's <br />standards, is required. This permit will be recorded against the <br />property. <br />26. Undergrounding Utilities - The applicant shall underground all overhead <br />utilities along Diller Street, which shall be shown on the building permit plans. <br />[SDR][ENGINEERING] <br />27. Sewer Capacity — Prior to encroachment permit issuance, submit to the City, and <br />obtain approval of, an evaluation and report prepared by a licensed engineer <br />demonstrating that the existing sewer mains have sufficient capacity for the <br />project. The study shall consider existing, project, other approved projects, <br />and applications currently under review in determining the needed capacity. If <br />the existing sewer main is less than 6" in size, or is in any other way not <br />sufficient as determined by the City Engineer, applicant shall, as part of the <br />Project, construct and install new sewer mains sufficient to meet such <br />requirements, in accordance with the City's Engineering standards and as <br />directed by the City Engineer to the City Engineer's satisfaction. <br />[SDR][ENGINEERING] <br />28. Peak Wet Weather Flow Capacity — The applicant shall reduce inflow and <br />infiltration (1/1), subject to the adopted methodology established by the <br />Engineering Division to offset increased sewer demand from the project by <br />replacing aged sewer mains or pay an equivalent in -lieu fee. The length of pipe <br />replacement required or the amount of fee will be based on the project's sewage <br />generation projection (Attachment L of the City's Engineering Standards). For <br />parcels within Redwood City but connecting to County owned and <br />maintained sewer, an 1/1 in -lieu fee may be collected by Redwood City if the <br />County does not require main replacement or collect and in -lieu fee. <br />[COA][ENGINEERING] <br />29. Sewer Lateral Limit — The project is limited to one sewer lateral. <br />[COA][ENGINEERING] <br />30. Water Mains - Prior to encroachment permit issuance, submit to City, and <br />obtain approval of, an evaluation and report, prepared by a licensed engineer, in <br />conformance with the City's Engineering Standards, demonstrating that the <br />ATTY/RESC.0031/ CC RESO ADOPTING DENIAL OF APPEAL BY REDWOOD CITY RESIDENTS FOR RESPONSIBLE DEVELOPMENT <br />REV: 03-30-17 PR RESO. NO. 15575 <br />MUFF NO. 603 <br />Page 12 of 23 <br />