Laserfiche WebLink
irrigation meter and a meter on the fire service backflow preventer. Any metering for <br />individual units must be accomplished by private sub -meters within the property. <br />[COA][ENGINEERING] <br />28. Recycled Water Facilities — Recycled water (purple pipe) facilities shall be provided <br />and designed in accordance with Engineering Standards for dual plumbing, irrigation, <br />and other warranted uses per the Recycled Water Ordinance, Chapter 38. Services <br />that are to be supplied by recycled water (either at the time of project completion or at <br />a future date) shall be designed to properly function at the design pressure required <br />by Engineering. Upon a final determination by the City that recycled water is available <br />for the property, the applicant shall connect the project to the recycled water system. <br />The project shall provide one "master" recycled water meter for residential dual <br />plumbing and a separate recycled water meter for the commercial/retail space dual <br />plumbing. [SDR][ENGINEERING] <br />29. Recycled Water Report - The applicant shall hire an engineer licensed in California <br />and experienced in the field of wastewater treatment to prepare a recycled water report <br />for dual plumbed facilities, pursuant to California Water Code section 13522.5 and in <br />accordance with California Code of Regulations sections 60314 and 60323 (found <br />within Title 22, Division 4, Chapter 3). The report shall be submitted prior to project <br />closeout, and will be routed to the Public Works Department for review and <br />coordination. It is recommended a draft of the report is prepared prior to commencing <br />any plumbing work to prevent the need for unplanned changes. [COA] <br />[ENGINEERING] <br />30. Cross -Connection Control Test - Prior to issuance of the certificate of occupancy, <br />all applicable plumbing systems must pass a cross -connection control test, performed <br />by a Cross -Connection Control Specialist Certified through the CA -NV Section of the <br />AWWA and observed by Public Works staff. The cross -connection control test method <br />must be included in the Recycled Water Report. The applicant is responsible for all <br />fees associated with the performance of the cross -connection control test. [COA] <br />[ENGINEERING] <br />31. Discharge Permit for Subterranean Garages - If the subterranean garage requires <br />groundwater pumping into the sewer system, a Discharge fee will apply and a <br />Discharge Permit will be required by Silicon Vallev Clean Water (SCVW) prior to <br />issuance of the building permit. [SDR][ENGINEERING] <br />32. Backflow Protection — Backflow protection on all water services is required. The <br />backflow preventer shall be above grade and located on private property, accessible <br />to the Public Works division for testing. [COA][ENGINEERING] <br />33. Fire Flow - The Project shall meet fire flow requirements as established by the Fire <br />Department which are based on the Fire Code. Fire flow tests are typically performed <br />during the preliminary design phase but must be completed prior to submittal of final <br />design. Applicant shall contact the Fire Department for fire flow requirements, and <br />then submit a written fire flow test request to Engineering. [COA][ENGINEERING] <br />ATTY/RESO.0013/PC RESO 801 BREWSTER <br />REV: 02-03-17 PR <br />Page 10 of 18 <br />