My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-02 0013 PC Reso 801 Brewster
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-02 0013 PC Reso 801 Brewster
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 12:22:37 PM
Creation date
4/10/2017 11:22:54 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/7/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
satisfaction, that all interior finishes and amenities in the affordable units are <br />equivalent to amenities used in market rate units. <br />50. Materials Mock -Up — Prior to final foundation inspection, prepare a mock-up that is <br />outdoors, readily accessible, and will remain intact until the project has reached <br />substantial completion. The mock-up should include all project colors and materials, <br />windows for the base and top, balconies, lighting, and architectural details, as well as <br />construction details, such as the weep screed, to understand how the design <br />addresses them. Then schedule a mock-up meeting With the Planning and Building <br />Departments for final review and approval of the project details. Submit an updated <br />colors and materials board or details if any changes are made as a result of the mock- <br />up meeting. [COA][PLANNING] <br />51. Certification Letters - Prior to final inspection, submit certification letters from the <br />following architects verifying that the project, as constructed, complies with approved <br />plans. After the certification letter has been submitted, the project planner will also <br />confirm substantial compliance with the approved plans during the scheduled final <br />inspection. [COA][PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance with the <br />approved landscape plan, including species, size, quantity, and location of the <br />approved trees, shrubs, and groundcover. It shall also verify landscape lighting, <br />fencing, irrigation, and other details as applicable. <br />b. Project Architect verifying substantial conformance with the approved <br />elevations, colors, materials, exterior light fixtures, and architectural details. <br />52. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic <br />Control Handbook. Street closures require submission of traffic control plans and <br />approval in advance. [SDR][ENGINEERING] <br />53. Public Parking During Construction — Temporary parking meter permits shall be <br />issued prior to removing any public parking spaces from public use during <br />construction. An application fee of $30.00, together with the parking meter fees <br />applicable for the expected duration of the temporary parking meter permit ($2.00- <br />$8.00 daily per space depending on location) shall be paid in advance prior to issuance <br />of the permit. ][ENGINEERING] <br />54. Winterizing - If construction is not complete by the start of the wet season (October 1 <br />through April 30), implement a winterization program to minimize the potential for <br />erosion and sedimentation. As appropriate to the site and status of construction, <br />winterization requirements shall include inspecting/maintaining/cleaning all soil <br />erosion and sedimentation controls prior to, during, and immediately after each storm <br />event; stabilizing disturbed soils through temporary or permanent seeding, mulching, <br />matting, tarping or other physical means; rocking unpaved vehicle access to limit <br />dispersion of much onto public right-of-way; and covering/tarping stored construction <br />materials, fuels, and other chemicals. Plans to include proposed measures to prevent <br />erosion and polluted runoff from all site conditions shall be submitted for approval by <br />CDD prior to beginning construction. As site conditions warrant, the City Engineer <br />ATTY/RES0.0013/PC RESO 801 BREWSTER <br />REV: 02-03-17 PR <br />Page 14 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.