My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-03 0017 PC Reso Recommending Certify EIR - California Way Water Tank
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-03 0017 PC Reso Recommending Certify EIR - California Way Water Tank
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 12:21:36 PM
Creation date
4/10/2017 11:23:31 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The buffer shall remain in place until construction is completed. If the roost is in <br />vegetation or a structure that is planned to be removed, the qualified biologist <br />shall work with CDFW to devise a plan to exclude the bats if removal of the roost <br />cannot be avoided. <br />Impact: BI0-3: Project construction could impact San Francisco dusky -footed woodrat, <br />a California species of special concern. <br />Mitigation: 13I0-3: Not more than thirty (30) days before initial ground disturbance on the <br />project site, a qualified biologist shall conduct a survey of the project site for any <br />existing woodrat houses. If any woodrat houses are found within the project site, <br />they shall be identified with flags or marking tape and protected from disturbance <br />with a minimum buffer zone of five feet around the house. If avoidance is not <br />feasible, the qualified biologist will contact CDFW with a proposal for removing <br />the woodrat house(s) using methods acceptable to CDFW. Currently, the <br />method requires that a biologist with a scientific collection permit trap the <br />woodrats, dismantle their house, relocate the house materials onto constructed <br />artificial houses in nearby suitable habitat that will not be disturbed, and release <br />the woodrats into the artificial house. Woodrat relocation would occur outside of <br />the rat maternity season and when there is no rain and nighttime temperatures <br />are greater than 40 degrees Fahrenheit. This mitigation measure shall be <br />performed under the direct supervision of a biologist approved for this project by <br />the CDFW. <br />Finding: Implementation of Mitigations BIO -1, BIO -2 and BIO -3 would reduce the project - <br />related impact to nesting birds, protected bat species and dusky -footed woodrat during <br />construction to a less than significant level. <br />Facts in Support of Finding: These mitigation measures are consistent with best <br />management practice to survey the site prior to tree removal and ground disturbance for the <br />presence of bird nests, dusky -footed woodrat nests, or colony bat roosts. If active bird nests, <br />dusky -footed woodrat nests, or colony bat roosts are found, a construction -free zone shall be <br />established. These measures shall be performed under the supervision of a qualified biologist in <br />consultation with the California Department of Fish and Wildlife. The measures shall remain in <br />place until young birds have fledged in the case of native birds or until construction is complete <br />for any colony bat roosts and dusky -footed woodrat nests. <br />Impact: 13I0-4: The proposed project would result in the removal of approximately 53 <br />native trees and 1 non-native tree. <br />Mitigation: BI0-4: Prior to project grading all areas of disturbance including pipeline <br />alignments shall be surveyed and staked and a field count performed to confirm <br />the exact number of trees to be removed. Consistent with routine CDFW <br />guidelines, the approximately 53 native trees to be removed by the project - <br />including approximately 50 coast live oaks, 2 coast redwoods and 1 Oregon ash - <br />shall be replaced in kind at a 3:1 ratio throughout the project site, including <br />Parcel 1, the scenic easement parcel. In addition, the one non-native tree <br />expected to be removed shall be replaced at a 1:1 ratio. Replacement trees shall <br />ATTY/RESO.0017/PC RESO RECOMMENDING CERTIFY EIR—CALIFORNIA WAY WATER TANK <br />REV: 02-16-17 PR <br />Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.