My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Power Engineering Contra
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Power Engineering Contra
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2008 4:20:41 PM
Creation date
10/7/2004 4:21:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Power Engineering Contractors
PROJECT NAME
bayfront canal culvert repairs
RMP File Number
304.5
Date
10/7/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> EXHIBIT "A" <br /> ..POWER <br /> ENGINEERING CONTRACTORS <br /> MARINE-CIVIL <br />September 15, 2004 SEP 1 6 2004 <br />Mr. Paul Willis <br />Project Engineer <br />Engineering and Construction <br />City of Redwood City <br />1017 Midd1efield Road <br />Redwood City, CA 94063 <br />650-780-7219 <br />Subject: Culvert Repair Proposal <br />Dear Mr. Willis, <br />We are pleased to provide a proposal to furnish all labor, materials, and equipment to <br />remove and replace approximately 25' of the existing culvert at the east end of Douglas <br />A venue. The work includes dewatering, demolition and off-haul of the existing concrete, <br />restoration of the sub-grade, and installation of the concrete channel bottom and sides to <br />the original grades. The total cost of this work is $38,700. <br />If you have any further questions, please call <br />1501 VIKING STREET. SUITE 200 · ALAMEDA, CA 94501 · 510/337-3800 FAX 510/337-3808 <br /> .~._._~... -- ......- ."._-~. ,~_._._-,--~._- '_~_-'."__~~"~_~~_'''H__._'_'_O_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.