My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord81 1850
RedwoodCity
>
City Clerk
>
Ordinances
>
1980-1989
>
1981
>
Ord81 1850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 1:02:08 PM
Creation date
10/11/2004 9:47:57 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Date
11/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CGM:djg-c 11/5/81 <br />ORIGINAL <br />O R D I N A N C E N 0. 1850 Nov 16 1981 <br />ORDINANCE AMENDING SECTION 38.10 OF THE CODE OF THE <br />CITY OF REDWOOD CITY, RELATING TO SERVICE CHARGES FOR <br />RENEWAL OF WATER SERVICE <br />THE COUNCIL OF REDWOOD CITY DOES ORDAIN AS FOLLOWS: <br />SECTION 1. Section 38.10 of the Code of the City of Redwood <br />City is hereby amended to read as follows: <br />"Section 38.10. Schedule of Fees. Every application for a <br />permit for a connection to the water system owned or operated <br />by the City of Redwood City shall- be accompanied by the follow- <br />ing connection fees applicable to premises located in the <br />designated water service areas: <br />AREAS 1, 2, 4, 5 & 6 AREA 3 <br />"(1) For 5/8x3/4 inch metered services <br />a charge of ....................... $ 95.00 $150.00 <br />"(2) For all service connections of <br />meter sizes larger than 5/8x3/4 <br />inch, the following charges: <br />"(3) In the event the actual total cost to the city of <br />installing the metered services exceeds the charges <br />set forth in subsections (1) and (2) of this section <br />38.10, the actual total cost shall be charged to the <br />applicant for such service. <br />"(4) The charge for a manifold meter installation shall <br />be the sum of the applicable individual charges for <br />each such installation." <br />SECTION 2. This ordinance shall be effective 30 days after <br />its adoption. <br />1850 <br />For 3/4 inch metered services <br />100.00 <br />175.00 <br />Wb <br />For 1 inch metered services <br />130.00 <br />230.00 <br />(c) <br />erv- <br />For 1-1/2 inch metered serv- <br />..... <br />ices......................... <br />ices.. ................ <br />275.00 <br />410.00 <br />(d) <br />: <br />For 2 inch metered services <br />385.00 <br />680.00 <br />(e) <br />For meters larger than 2 <br />inch the amount of the <br />charge shall be set by the <br />director of public works <br />based upon his estimate of <br />the total cost of installing <br />the service. <br />"(3) In the event the actual total cost to the city of <br />installing the metered services exceeds the charges <br />set forth in subsections (1) and (2) of this section <br />38.10, the actual total cost shall be charged to the <br />applicant for such service. <br />"(4) The charge for a manifold meter installation shall <br />be the sum of the applicable individual charges for <br />each such installation." <br />SECTION 2. This ordinance shall be effective 30 days after <br />its adoption. <br />1850 <br />
The URL can be used to link to this page
Your browser does not support the video tag.