My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:43:31 AM
Creation date
5/4/2017 3:47:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program – Hillside Alternative EXHIBIT B <br />California Water Tank and Pump Station Final EIR – February 2017 <br />City of Redwood City <br />Page 10 of 11 <br />ATTY/RESO.0017/PC RESO RECOMMENDING CERTIFY EIR – CALIFORNIA WAY WATER TANK <br />REV: 02-16-17 PR <br /> <br /> <br />IMPACT GEO-1: <br />Construction may impact slope <br />stability for both temporary cut <br />slopes during construction and <br />the long-term stability of the <br />permanent cut slopes under <br />seismic conditions. <br />Mitigation Measure GEO-1: <br />Prepare a detailed geotechnical report to <br />address slope stability and follow the <br />geotechnical engineer’s recommendations in <br />the design of the project to achieve <br />acceptable factors of safety under seismic <br />conditions. <br />Implementation: <br />The City shall <br />retain a <br />geotechnical <br />engineer to prepare <br />a detailed <br />geotechnical report. <br />The engineer’s <br />recommendations <br />shall be <br />incorporated in the <br />construction <br />documents. <br /> <br />Timing: during the <br />detailed design <br />phase and during <br />construction. <br />Monitoring: <br />The City’s Engineering <br />Division shall ensure <br />the geotechnical report <br />recommendations are <br />included in the design <br />documents and <br />implemented during <br />construction. <br />Initials: <br /> <br />Date: <br /> <br /> 8.A. - Page 61
The URL can be used to link to this page
Your browser does not support the video tag.