My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:43:31 AM
Creation date
5/4/2017 3:47:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
remaining years of the five-year CIP are for planning purposes. Projects identified in <br />years beyond FY 2017-18 are largely unfunded <br />these projects at this time. <br /> <br />Proposed FY 2017 <br /> <br /> <br /> <br />Functional Areas <br /> <br />A brief summary of needs by each functional area is presented below with highlights of <br />proposed projects. A discussion of both the FY <br />included. <br /> <br />1. Administration <br /> <br />This functional area includes personnel costs of administering the program. <br />35.12 Full Time Equivalent (FTE) positions are currently funded out of the CIP. <br />recommend moving 7.91 FTE <br />2017-18, as an analysis of the positions showed that these positions <br />focused on non-CIP initiatives. <br /> <br />year CIP are for planning purposes. Projects identified in <br />18 are largely unfunded; no budget approval is <br />Proposed FY 2017-18 CIP Allocations by Functional Area <br />A brief summary of needs by each functional area is presented below with highlights of <br />A discussion of both the FY 2017-18 and five-year CIP needs is <br />This functional area includes personnel costs of administering the program. <br />Full Time Equivalent (FTE) positions are currently funded out of the CIP. <br />FTE out of the CIP and into the General Fund beginning in FY <br />as an analysis of the positions showed that these positions <br />CIP initiatives. <br />year CIP are for planning purposes. Projects identified in <br />is requested for <br /> <br />A brief summary of needs by each functional area is presented below with highlights of <br />year CIP needs is <br />This functional area includes personnel costs of administering the program. A total of <br />Full Time Equivalent (FTE) positions are currently funded out of the CIP. Staff <br />beginning in FY <br />as an analysis of the positions showed that these positions primarily are <br />9.A - Page 4
The URL can be used to link to this page
Your browser does not support the video tag.