My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:43:31 AM
Creation date
5/4/2017 3:47:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<<INSERT PROJECT PICTURE>> <br /><<WIDTH: 6.75, HEIGHT: 1.66>> <br />PROJECT DESCRIPTION <br />PROJECT BENEFITS <br />PROJECT STATUS <br />PROJECT SCHEDULE <br />PROJECT ESTIMATES <br />Prior 2017/18 2018/19 2019/20 2020/21 2021/22 5-Year Future <br />Appropriations Budget Planned Planned Planned Planned Total Years <br />$0 $325,000 $200,000 $100,000 $100,000 $725,000 <br />Total $0 $325,000 $200,000 $100,000 $100,000 $725,000 <br />CITY BUILDING ENERGY EFFICIENCY PROGRAM <br />GOVERNMENT OPERATIONS <br />Based on the Comprehensive Facility Condition and Solar <br />Assessments study results City facilities will be upgraded to reduce <br />energy and water consumption and waste generation. <br />• Reduces energy, water consumption and waste generation at public facilities. <br />• Reduces utility costs at public facilities. <br />• Upgrades equipment and reduces maintenance and repair costs at public facilities. <br />• Assists with meeting Climate Action Plan greenhouse gas emission reduction targets at public facilities. <br />This is a new project, and facility condition and solar assessments are currently underway and should be completed <br />by the end of the fiscal year. Specific projects will be developed based on the study results. <br />6 of 140 <br />9.A - Page 32
The URL can be used to link to this page
Your browser does not support the video tag.