My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:43:31 AM
Creation date
5/4/2017 3:47:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program EXHIBIT B <br />Page 12 of 26 <br />ATTY/RESO.0042/CC RESO CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT <br />REV: 05-03-17 PR df <br />Impact BIO-2: Tree <br />removal and/or demolition of <br />the existing pump station <br />building could significantly <br />Mitigation Measure BIO-2: A <br />preconstruction survey for maternity <br />(March 1 to August 1) or colony bat roosts <br />(year-round) shall be conducted by a <br />Implementation: <br />The City shall either <br />carry out this <br />measure itself or <br />Monitoring: The City’s <br />Engineering Division <br />shall review all <br />appropriate bid, <br />Initials: <br /> <br />Date: <br /> <br /> <br /> <br /> <br /> <br />Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measure Implementation <br />and Timing <br />Monitoring <br />Responsibility <br />Verified <br />Implementation 8.A. - Page 19
The URL can be used to link to this page
Your browser does not support the video tag.