My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:43:31 AM
Creation date
5/4/2017 3:47:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program EXHIBIT B <br />Page 20 of 26 <br />ATTY/RESO.0042/CC RESO CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT <br />REV: 05-03-17 PR df <br />Impact BIO-6: Project <br />construction could result in <br />the spread of invasive, non- <br />native French broom or other <br />invasive plants on the site. <br />Mitigation Measure BIO-6: French broom <br />(Genista monspessulana) stands or other <br />invasive plants on the site shall be removed <br />from the site outside of the blooming period <br />(April through June for French broom) and <br />removed plants shall be bagged or placed in <br />a covered container (dumpster or covered <br />truck) and disposed of at a landfill. All <br />equipment used for the removal of French <br />broom or other invasive plants shall be <br />cleaned before being used at another, non- <br />infested part of the site. <br />Implementation: <br />The City shall either <br />carry out this <br />measure itself or <br />incorporate this <br />biology mitigation <br />measure into all <br />appropriate bid, <br />contract, and <br />engineering and site <br />plan (e.g. building, <br />grading, <br />improvement plans) <br />documents. <br />Timing: Prior to <br />any ground- <br />Monitoring: The City’s <br />Engineering Division <br />shall review all <br />appropriate bid, <br />contract, and <br />engineering and site <br />(building, grading, <br />improvement plans) <br />documents for inclusion <br />of biological measures. <br />A report shall be <br />submitted to the City <br />documenting the broom <br />removal. <br />Initials: <br />Date: 8.A. - Page 27
The URL can be used to link to this page
Your browser does not support the video tag.