Laserfiche WebLink
Mitigation Monitoring and Reporting Program EXHIBIT B <br />Page 22 of 26 <br />ATTY/RESO.0042/CC RESO CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT <br />REV: 05-03-17 PR df <br />Impact HAZ-1: The use or <br />accidental release of <br />hazardous materials at the <br />project site could expose the <br />public or environment to <br />significant hazards. <br />Mitigation Measure HAZ-1: The <br />following measures, as listed in the <br />ProTech Consulting & Engineering report <br />titled Pre-Demolition/Renovation Asbestos <br />& Lead Survey & Evaluation, shall be <br />implemented during demolition activities <br />associated with the existing pump station: <br />• Prior to demolition, the loose and <br />peeling exterior Lead Based Paint shall <br />be removed from the pump station <br />building with the remaining paint <br />stabilized. <br />• The impact of lead to the demolition <br />project should be minimal; however, <br />Cal OSHA worker protection rules, <br />California Department of Public Health <br />certification requirements, US EPA <br />standards, and Department of Toxic <br />Substance Control disposal <br />requirements need to be assessed by <br />each contractor/employer who performs <br />work on this project. <br />• Any work performed at the site where <br />Lead Based Paint or Lead Containing <br />Paint is likely to be disturbed should be <br />performed by a contractor trained and <br />qualified to perform lead-related <br />construction work. Any work that <br />Implementation: <br />The City shall <br />incorporate this <br />hazards and <br />hazardous materials <br />mitigation measure <br />into all appropriate <br />bid, contract, and <br />engineering and site <br />plan (e.g. building, <br />grading, <br />improvement plans) <br />documents. <br />Timing: Prior to <br />any ground- <br />disturbing activities, <br />unless otherwise <br />specified. <br />Monitoring: The City’s <br />Engineering Division <br />shall review all <br />appropriate bid, <br />contract, and <br />engineering and site <br />(building, grading, <br />improvement plans) <br />documents for inclusion <br />of this <br />hazards/hazardous <br />materials measure. <br />The City shall require a <br />report documenting the <br />process followed to <br />demolish the pump <br />station and properly <br />dispose of the <br />demolition debris. <br />Initials: <br />Date: 8.A. - Page 29