My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2017
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:07:08 AM
Creation date
5/11/2017 8:04:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program — Hillside Alternative <br />Mitigation Monitoring and Reporting Program <br />Impact <br />Mitigation Measure <br />Implementation <br />Monitoring <br />and Timing <br />Responsibility <br />impact protected bat species <br />qualified biologist and done within 14 days <br />incorporate this <br />contract, and <br />if an occupied or perennial <br />prior to activities that remove vegetation or <br />biology mitigation <br />engineering and site <br />(but unoccupied) maternity or <br />structures (the pump station). If an <br />measure into all <br />(building, grading, <br />colony roost is present. <br />occupied maternity or colony roost is <br />appropriate bid, <br />improvement plans) <br />detected, the biologist shall contact CDFW <br />contract, and <br />documents for inclusion <br />to determine the appropriate buffer relative <br />engineering and site <br />of biological measures. <br />to the: <br />plan (e.g. building, <br />• Proximity and noise level of project <br />grading, <br />activities <br />improvement plans) <br />• Distance and amount of vegetation <br />documents. <br />or screening between the roost and <br />Timing: Prior to <br />construction activities <br />any ground- <br />• Species-specific needs, if known, <br />disturbing activities, <br />such as sensitivity to disturbance. <br />unless otherwise <br />Due to restrictions of the California Health <br />specified. <br />Department, direct contact by workers with <br />any bat is not allowed. The qualified bat <br />biologist will be contacted immediately if a <br />bat roost is discovered during project <br />construction. <br />The buffer shall remain in place until <br />construction is completed. If the roost is in <br />vegetation or a structure that is planned to <br />be removed, the qualified biologist shall <br />work with CDFW to devise a plan to <br />exclude the bats if removal of the roost <br />cannot be avoided. <br />Page 4 of 28 <br />ATTY/ RESO.0043/CC RESO HILLSIDE ALTERNATIVE PROJECT RESO. NO. 15582 <br />REV: 05-06-17 PR MUFF NO. 802 <br />EXHIBIT B <br />Verified <br />Implementation <br />
The URL can be used to link to this page
Your browser does not support the video tag.