My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2017
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:07:08 AM
Creation date
5/11/2017 8:04:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoringand Reporting Program —Hillside Alternative <br />Impact 13I0-5: The proposed <br />Mitigation Measure 11I0-5: The following <br />project could damage trees to <br />tree protection measures shall be included <br />be retained during project <br />in the project in order to protect trees to be <br />construction. <br />retained during construction: <br />Damage to any tree during <br />construction shall be reported to the <br />City's Landscape Architect, and <br />project contractors shall treat the <br />tree for damage in the manner <br />specified by the City's Landscape <br />Architect. <br />No construction equipment, <br />vehicles or materials shall be <br />stored, or parked within the tree <br />dripline. <br />Cutting and filling around the base <br />of trees shall be done only after <br />consultation with the City <br />Landscape Architect and then only <br />to the extent authorized by the City <br />Landscape Architect. <br />No waste construction materials or <br />wastewater shall be dumped on the <br />ground between the dripline and <br />the base of the tree or uphill from <br />any tree where certain substances <br />might reach the roots through a <br />leaching process. <br />Implementation: <br />Monitoring: The City's <br />The City shall <br />Engineering Division <br />incorporate this <br />shall review all <br />biology mitigation <br />appropriate bid, <br />measure into all <br />contract, and <br />appropriate bid, <br />engineering and site <br />contract, and <br />(building, grading, <br />engineering and site <br />improvement plans) <br />plan (e.g. building, <br />documents for inclusion <br />grading, <br />of biological measures. <br />improvement plans) <br />City shall conduct <br />documents. <br />inspections during <br />Timing: Prior to <br />construction to ensure <br />any ground- <br />tree protection measures <br />disturbing activities, <br />are maintained <br />unless otherwise <br />throughout the <br />specified. construction period <br />Page 30 of 28 <br />ATTY/ RESO.0043/CC RESO HILLSIDE ALTERNATIVE PROJECT RESO. NO. 15582 <br />REV: 05-06-17 PR MUFF NO. 802 <br />Initials: <br />Date: <br />EXHIBIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.