My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2017
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:07:08 AM
Creation date
5/11/2017 8:04:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/08/2017 <br />be in good health and should be from local stock if feasible. Minimum size for <br />replacement trees shall be a 15- gallon container. Irrigation shall be installed to <br />ensure newly planted trees receive appropriate watering for the species. Newly <br />planted trees shall also be protected from deer browse. Replacement trees shall <br />be monitored for at least five years and shall be re -planted if they die. <br />The City will integrate the replacement trees into the project's final landscape <br />plan. Should the landscape plan not be able to accommodate all of the required <br />mitigation trees without over -crowding the site, the City shall provide the <br />remaining number of mitigation trees to the Redwood City Tree Bank Fund for <br />planting in other parts of the City. The mitigation trees shall be planted within 12 <br />months of project completion, in a suitable site where long-term survival is likely. <br />The mitigation trees shall be monitored for a five-year period and shall be re- <br />planted if they die. <br />Impact: BIO -5: The proposed project could damage trees to be retained during project <br />construction. <br />Mitigation: BIO -5: The following tree protection measures shall be included in the project in <br />order to protect trees (including mature trees) to be retained during construction: <br />• Damage to any tree during construction shall be reported to the City's <br />Landscape Architect, and project contractors shall treat the tree for damage <br />in the manner specified by the City's Landscape Architect. <br />• No construction equipment, vehicles or materials shall be stored, or parked <br />within the tree dripline. <br />• Cutting and filling around the base of trees shall be done only after <br />consultation with the City Landscape Architect and then only to the extent <br />authorized by the City Landscape Architect. <br />• No waste construction materials or wastewater shall be dumped on the <br />ground between the dripline and the base of the tree or uphill from any tree <br />where certain substances might reach the roots through a leaching process. <br />• Barricades shall be constructed around the trunks of trees as specified by <br />the City Landscape Architect to prevent injury to trees making them <br />susceptible to disease causing organisms. <br />• The City Landscape Architect shall inspect the perimeter of the area of <br />ground disturbance and pipeline alignments within the site to determine <br />whether construction could damage the roots of retained trees. The <br />Landscape Architect shall make appropriate recommendations to ensure the <br />roots of retained trees are not significantly damaged. <br />Impact: 13I0-6: Project construction could result in the spread of invasive, non-native <br />French broom or other invasive plants on the site. <br />Mitigation: 13I0-6: French broom (Genista monspessulana) stands or other invasive plants <br />on the site shall be removed from the site outside of the blooming period (April <br />through June for French broom) and removed plants shall be bagged or placed <br />in a covered container (dumpster or covered truck) and disposed of at a landfill. <br />Page 6 of 28 <br />ATTY/ RESO.0043/CC RESO HILLSIDE ALTERNATIVE PROJECT RESO. NO. 15582 <br />REV: 05-06-17 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.