Laserfiche WebLink
IMP 18 <br />IMP 19 <br />IMP 20 <br />IMP 21 <br />IMP 22 <br />IMP 23 <br />IMP 24 <br />IMP 25 <br />IMP 26 <br />IMP 27 <br />IMP 28 <br />VI. Sediment Removal: <br />Total amount of accumulated sediment removed from the stormwater treatment measure(s) during <br />the reporting period: cubic yards. <br />How was sediment disposed? <br />❑ landfill <br />❑ other Iocation on-site as described in and allowed by the maintenance plan other, <br />❑ explain <br />VII. Inspector Information: <br />The inspections documented in the attached Inspection and Maintenance Checklists were <br />conducted by the following inspector(s): <br />1-4 O&M Inspection Report <br />ATTY/AGR/2017.072/STANFORD - STMMA <br />REV: 04-05-17 PR <br />