Laserfiche WebLink
  <br />  <br />  <br />  <br />BERKELEY <br />CARLSBAD <br />FRESNO <br />IRVINE <br />PALM SPRINGS <br />POINT RICHMOND <br />RIVERSIDE <br />ROSEVILLE <br />SAN LUIS OBISPO <br />2215 Fifth Street, Berkeley, California  94710     510.540.7331     www.lsa.net  <br />April 21, 2017  <br />  <br />Lisa Costa Sanders, Principal Planner  <br />City of Redwood City  <br />Community Development Department  <br />Planning and Housing Division  <br />1017 Middlefield Road  <br />Redwood City, CA 94063  <br />  <br />Subject: REVISED Proposal to Prepare the Environmental Review Documentation for the 1548  <br />Maple Street Project  <br />  <br />Dear Lisa:  <br />  <br />This letter provides the scope of work that LSA Associates, Inc. (LSA) will undertake to prepare the  <br />environmental review documentation for the 1548 Maple Street Project. This proposed scope of  <br />work replaces and supersedes LSA’s proposal to prepare an Initial Study for the 1548 Maple Street  <br />Project (formerly referred to as the Watt Residential Project), dated October 26, 2016 and the revised  <br />scope of work dated March 23, 2017.  <br />  <br />Preparation of the environmental review documentation will be staffed by Theresa Wallace, AICP,  <br />Associate, who will serve as Project Manager, Judith Malamut, who will serve as Principal‐in‐Charge,  <br />and Matthew Wiswell, Assistant Planner. LSA’s team will also include in‐house cultural and  <br />biological resource specialists, as indicated on our proposed budget, as well as two subconsultants:  <br />Fehr & Peers, who will prepare the traffic analysis; and BASELINE Environmental Consulting  <br />(BASELINE), who will prepare an analysis of potential impacts related to geology/soil, hydrology/ <br />water quality, and hazards.   <br />  <br />  <br />A. PROJECT UNDERSTANDING  <br />The proposed project would include development of approximately 131 three‐story townhome‐style  <br />residential condominium units, surface parking, and private and public open space at 1548 Maple  <br />Street in Redwood City, San Mateo County. The 7.2‐acre project site is located east of Highway 101  <br />and along the City’s waterfront. The proposed project would be located on land only, and would  <br />include development of a portion of the Bay Trail along the waterfront. Adjacent and nearby uses  <br />include the City’s Police Station, the San Mateo County Jail, the San Mateo County Women’s Shelter,  <br />Docktown Marina, and various industrial uses. The project site is also less than a mile (0.6 miles)  <br />from the Highway 101/84 interchange project for which Caltrans is currently conducting an  <br />environmental review. Existing on‐site uses include a surface parking lot and a water tank that has  <br />been converted into a local yacht club clubhouse. The water tank is considered to be a locally  <br />eligible historic resource.  <br />  <br />The project site is within the study area of the Inner Harbor Specific Plan (IHSP), for which a Draft  <br />Environmental Impact Report (IHSP Draft EIR) has been prepared and released for public review.  <br />However, the IHSP and the IHSP Draft EIR were not adopted and no further work related to these  <br />efforts is contemplated at this time. These documents are available for reference only.  <br /> <br />ATTY/AGR/2017/AMENDMENTS/AMEND NO.1 LSA ASSOCIATES INC. <br />REV: 05-03-17 VR <br />Page 3 of 27 <br />EXHIBIT A <br />SCOPE OF SERVICES AND FEE6.1.A. - Page 6