Laserfiche WebLink
REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br /> <br />May 22, 2017 <br /> <br />SUBJECT <br />Approval of the Green Infrastructure Workplan to develop a Green Infrastructure Plan in <br />Accordance with Provision C.3.j of the Municipal Regional Permit. <br /> <br />RECOMMENDATION <br />Adopt a Resolution approving the Green Infrastructure Workplan to develop a Green <br />Infrastructure Plan in Accordance with Provision C.3.j of the Municipal Regional Permit <br /> <br /> <br />BACKGROUND <br />In November, 2015 the California Regional Water Quality Control Board (RWQCB) <br />issued the second version of the Municipal Regional Stormwater National Pollution <br />Discharge Elimination System (NPDES) permit, which sets the requirements of <br />stormwater discharges into receiving waters (such as creeks and the San Francisco <br />Bay). As a co-permittee, the City is obligated to follow the guidelines of the NPDES <br />permit to control stormwater discharge within City limits. <br /> <br />Past iterations of the NPDES permit set standards for larger private developments to <br />capture and treat stormwater runoff from new and replaced roofs, parking lots, and <br />other impervious surfaces. This is done primarily through Low Impact Development <br />(LID) design that emphasizes conservation and use of on-site natural features to protect <br />water quality and promote ground water infiltration, although the NPDES permit does <br />allow for mechanical treatment in areas that are high density and transit adjacent (like <br />Downtown Redwood City). Many development projects have had to meet these <br />requirements, and because of the guidelines of the permit the City has become <br />obligated to certain reporting and inspection requirements to ensure the long-term <br />maintenance of these site features. <br /> <br />In this latest version of the permit, a new section was added for “Green Infrastructure” <br />(GI). This new section requires that all permittees develop a GI Plan to meet the <br />following goal: <br /> <br />“Over the long term, the Plan is intended to describe how the Permittees will shift <br />their impervious surfaces and storm drain infrastructure from gray, or traditional <br />storm drain infrastructure where runoff flows directly into the storm drain and then <br />the receiving water, to green—that is, to a more-resilient, sustainable system that <br />slows runoff by dispersing it to vegetated areas, harvests and uses runoff, <br />6.3.D. - Page 1