  <br />4/21/17 (P:\RWC1401D 1548 Maple St\ADMIN\Contract\EIR SOW\1548 Maple EIR SOW 04‐21‐17.docx)  3  <br />C. SCOPE OF WORK  <br />LSA will undertake the following tasks, as  <br />identified in Table 1, Work Program Outline,  <br />and described in greater detail below, for  <br />preparation of the EIR and Initial Study for the  <br />proposed project.   <br />  <br />TASK A.  PROJECT INITIATION  <br />Project initiation will consist of several tasks,  <br />including attendance at a project start‐up  <br />meeting, a site visit/field surveys, and data  <br />gathering and review. The project description  <br />for the EIR, which will also be used for the  <br />Notice of Preparation (NOP) and Initial Study  <br />will also be prepared as part of project  <br />initiation subtasks.   <br />  <br />1. Start‐Up Meeting/Site Visit  <br />LSA attended a start‐up meeting with City  <br />staff on February 7, 2017. At this meeting, the  <br />project team discussed elements of the  <br />proposed project, the status of the develop‐ <br />ment application, and various data needs.  <br />Subsequent to the start‐up meeting, the  <br />approach to environmental review was  <br />revised.   <br />  <br />LSA will also visit the project site to familiarize  <br />ourselves with existing conditions and site  <br />features. Photographs of the site and adjacent  <br />land uses will be obtained during the site visit.   <br />  <br />2. Data Gathering and Evaluation  <br />Existing data and analyses applicable to the  <br />project site and vicinity will be collected and  <br />evaluated. These include the IHSP and its  <br />Draft EIR, other background documents  <br />obtained from the City and/or the applicant,  <br />and applicable Redwood City planning, policy,  <br />and environmental documents. We assume that the primary source of background information on the  <br />project site and surroundings will be the IHSP Draft EIR and associated technical studies.   <br />  <br />Table 1: Work Program Outline   <br />TASK A.  PROJECT INITIATION   <br /> 1. Start‐Up Meeting/Site Visit  <br /> 2. Data Gathering and Review  <br /> 3. Notice of Preparation/Scoping Session  <br /> 4. Project Description  <br /> 5. Work Program Refinement  <br />TASK B.  INITIAL STUDY  <br /> 1. Administrative Draft Initial Study   <br /> a. Aesthetics  <br /> b. Agriculture and Forestry Resources  <br /> c. Geology and Soils  <br /> d. Greenhouse Gas Emissions  <br /> e. Mineral Resources   <br /> f. Parks and Recreation  <br /> g. Population and Housing  <br /> h. Public Services  <br /> i. Tribal Cultural/AB 52 Consultation  <br /> j. Mandatory Findings   <br /> 2. Screencheck Draft Initial Study  <br /> 3. Public Review Draft Initial Study  <br />TASK C.  ENVIRONMENTAL IMPACT REPORT  <br /> 1. Setting and Impacts   <br /> a. Land Use and Planning  <br /> b. Biological Resources  <br /> c. Cultural Resources  <br /> d. Transportation and Circulation  <br /> e. Air Quality  <br /> f. Noise  <br /> g. Hazards and Hazardous Materials  <br /> h. Hydrology and Water Quality  <br /> i. Utilities and Service Systems   <br /> 2. Alternatives Analysis  <br /> 3. Other CEQA Considerations  <br /> 4. Administrative Draft EIR  <br /> 5. Screencheck Draft EIR  <br /> 6. Public Review Draft EIR  <br />TASK D.  RESPONSE TO COMMENTS DOCUMENT  <br /> 1. Administrative Draft RTC Document   <br /> 2. Screencheck Draft RTC Document  <br /> 3. Final RTC Document  <br /> 4. Mitigation Monitoring and Reporting Program  <br /> 5. Findings of Fact and Statement of Overriding  <br />Considerations  <br /> 4. Administrative Record  <br />TASK E.  PUBLIC HEARINGS AND MEETINGS  <br />TASK F.  PROJECT MANAGEMENT  <br /> <br />ATTY/AGR/2017/AMENDMENTS/AMEND NO.1 LSA ASSOCIATES INC. <br />REV: 05-03-17 VR <br />Page 5 of 27 <br />6.1.A. - Page 8