My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 8:17:26 AM
Creation date
5/18/2017 3:43:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/22/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-15-17 PR <br />Page 6 of 17 <br />Task Key Roles Timeframe <br />A.5 Define the methodology for integration of the GI project opportunities phasing plan <br />into Permittee’s long-term planning and capital improvement plans and processes. This <br />should include projects that are intended to be implemented following the current permit term; <br />those that are intended to be implemented to achieve the 2030 and 2040 load reduction <br />targets.1 <br />A.5.1 Draft model methodology <br />and review with GI TAC. <br />Primary: <br />Consultants and <br />C/CAG <br />Review: Member <br />Agencies <br />1st quarter FY 17-18 develop and <br />review with TAC. <br />A.5.2 Review and finalize model <br />methodology. <br />Primary: Member <br />Agencies <br />Secondary: <br />Consultants and <br />C/CAG <br />Finalize model methodology October <br />2017. <br />TAC review and comment on final <br />draft, early November 2017. <br />Final model methodology delivered to <br />member agencies in December 2017. <br />A.6 Develop and integrate <br />into GI Plan for adoption. <br />Begin 2nd quarter FY 17/18 and complete for inclusion in <br />Annual Report submittal of September 30, 2019 <br /> <br />B. Develop process for tracking and mapping completed projects <br />This work covers needs of Provision C.3.j.i.(2)(d) of the MRP: <br />A process for tracking and mapping completed projects, public and private, and making the <br />information publically available. <br />Task Key Roles Timeframe <br />B.1 Work with C/CAG through GI TAC to identify <br />model methodology for mapping and finalizing <br />database information for projects as they are <br />completed. This work will include development of <br />publicly accessible element of web-based <br />mapping and data tool. <br />Primary: Consultants <br />and C/CAG <br />Review: Member <br />Agencies <br />July through <br />December 2017. <br /> <br />1 The workplan for completion of prioritized projects, those to be completed by 2020, is included in <br />section F below, related to Provision C.3.j.i.(2)(j) of the MRP. <br />6.3.D. - Page 12
The URL can be used to link to this page
Your browser does not support the video tag.