Laserfiche WebLink
REV: 05-15-17 PR <br />Page 11 of 17 <br />Task Key Roles Timeframe <br />E.1.2 Prepare and review draft <br />model plan update language for <br />priority sample documents. <br />Primary: <br />Consultants <br />and C/CAG <br />Review: <br />Member <br />Agencies <br />Draft text prepared late-September thru <br />mid-November 2016. <br />TAC reviewed mid-November thru <br />December 2016. <br />E.1.3 Participate in GI TAC meeting <br />to give direction on refinements to <br />outline for model planning content <br />and resolve comments. <br />Primary: <br />Member <br />Agencies <br />Facilitation: <br />Consultants <br />and C/CAG <br />Completed December 2016. <br />E.1.4 Prepare and review draft <br />model planning update materials <br />from C/CAG. <br />Primary: <br />Consultants <br />and C/CAG <br />Review: <br />Member <br />Agencies <br />Prepared full draft early 2017. <br />TAC reviewed March 2017. <br />E.1.5 Prepare final draft model <br />planning update materials. <br />Primary: <br />Consultants <br />and C/CAG <br />Prepare final draft June thru November <br />2017. <br />E.1.6 Begin utilizing final model <br />planning update materials to revise <br />Permittee-specific documents; see <br />below for further details. <br />Primary: <br />Member <br />Agencies <br />As needed through Planning Document <br />Updates. <br />E.2 Make modifications to Permittee-specific planning documents. <br />E.2.1 Make needed modifications <br />to planning documents that are <br />currently being updated or <br />created, for other purposes, during <br />the preparation of development of <br />model language, to the extent <br />feasible. <br />Primary: <br />Member <br />Agencies <br />As needed through Planning Document <br />Updates, as further specified in the <br />workplan to be prepared under MRP <br />Section C.3.j.i.(2)(i). <br />E.2.2 Draft modifications or <br />updates to each existing planning <br />document, needing this effort, to <br />appropriately incorporate green <br />infrastructure requirements. <br />Primary: <br />Member <br />Agencies <br />As needed through Planning Document <br />Updates, as further specified in the <br />workplan to be prepared under MRP <br />Section C.3.j.i.(2)(i). <br />6.3.D. - Page 17