My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 8:17:26 AM
Creation date
5/18/2017 3:43:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/22/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 22 of 27 <br /> <br />Table 6: Comparison of General Plan and Recent Traffic Volumes on <br />Massachusetts Avenue (Woodside to Alameda de las Pulgas) <br /> “Existing” <br />Volume <br />(2008) 2 <br />“Project” <br />Volumes <br />(2030) <br />Recent <br />Traffic <br />Count3 <br />Volume <br />Threshold <br />for LOS E4 <br />Additional Volume <br />Required to Trigger <br />Impact (LOS E) <br />Average Daily <br />Traffic (ADT) 9,1001 --- 6,800 --- __ <br />AM Peak <br />Hour Volume 986 1,030 364 1,610 1,246 <br />PM Peak <br />Hour Volume 789 860 625 1,610 985 <br />1 Redwood City New General Plan Technical Report (September 2008). Figure 7: <br />Roadway Segment Average Daily Traffic Volume <br />2 Redwood City New General Plan Draft EIR (May 2010). Table 4.14-2 Existing (2008) <br />Roadway Segment Levels of Service Summary <br />3 Traffic counts collected August 2012. <br />4 Redwood City New General Plan Draft EIR (May 2010). Table 4.14-1 Roadway <br />Segment LOS Thresholds <br /> <br /> <br />Downtown Precise Plan Traffic Projections <br />Similarly, an EIR was prepared for the Downtown Precise Plan. The EIR was certified <br />on January 24, 2011. As required by the California Environmental Quality Act, the DTPP <br />EIR examined several traffic scenarios. Each of these scenarios builds on the last, to <br />provide decision makers with a comprehensive picture of potential traffic conditions. The <br />scenarios are as follows: <br /> <br />· Existing Conditions: This scenario examined how the intersections were <br />operating in the analysis phase leading up to plan adoption. For several <br />intersections, the counts were taken in 2008, while others were taken in 2010. <br /> <br />· Background Conditions: This scenario includes the existing traffic volumes and <br />the projected traffic volumes from projects that were approved but not yet built (at <br />the time of DTPP adoption). <br /> <br />· Project Conditions: This scenario includes Background Conditions and net new <br />traffic volumes expected from full build-out of the DTPP. As a result of the Project <br />Conditions analysis, the DTPP EIR identified significant and unavoidable traffic <br />impacts at the following intersections: <br />· El Camino Real/Whipple* <br />· El Camino Real/Jefferson <br />· Main/Woodside* <br />· Middlefield/Woodside* <br />· Broadway/Woodside* <br />· Veterans/Whipple* <br />8.A. - Page 22
The URL can be used to link to this page
Your browser does not support the video tag.