My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 8:17:26 AM
Creation date
5/18/2017 3:43:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/22/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0048/CC RESO 612 JEFFERSON (HABITAT) APPEAL <br />REV: 05-15-17 VR <br />Page 6 of 22 <br />6. Transportation Impact Fee - Pay a Transportation Impact Fee for the net new trips <br />resulting from the proposed project, estimated at $10,420.00 [SDR] [ENGINEERING] <br />7. Parks Impact Fee – Pay a Parks Impact Fee for the net new dwelling units resulting <br />from the proposed project, estimated at $106,885.30, prior to final map approval, <br />except that if an Affordability Agreement is executed pursuant to Condition 17(f), then <br />the Parks Impact Fee shall be $0. [SDR][PARKS] <br />8. School Impact Fee – For residential additions greater than 500 square feet and new <br />commercial or industrial construction, pay a School Impact Fee to the Sequoia Union <br />High School District. Information regarding this fee may be obtained by contacting the <br />Sequoia Union High School District at (650) 369-1411. [SDR][SCHOOL DISTRICT] <br /> <br />9. Water and Sewer Fees – Pay applicable water, recycled water, and wastewater- <br />related fees as outlined on the City’s website. [SDR][ENGINEERING] <br /> <br />10. Notice of Fees Protest – The applicant may protest any fees, dedications, <br />reservations, or other exactions imposed by the City as part of the approval or as a <br />condition of approval of this development. Per California Government Code Section <br />66020, this 90-day protest period has begun as of the date of the approval of this <br />application. [SDR][OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />11. Water-Efficient Landscaping – Provide a landscaping and irrigation plan conforming <br />to the California Water-Efficient Landscape Ordinance (AB 1881), including an <br />automatic irrigation system (drip, micro-spray, or bubblers) with a rain sensor, and <br />show these measures on the building perm it plans. [COA][PLANNING] <br />12. Street Trees - A total of one (1) (24-inch box) street tree shall be planted along the <br />Jefferson Avenue frontage. The tree species and location will be determined by the <br />City Landscape Architect. These improvements shall be included as part of the <br />building permit submittal package. Newly planted trees shall be both irrigated and <br />maintained by the applicant. [SDR][PLANNING] <br />13. Stormwater Runoff - Post-construction runoff into the storm drain shall not exceed <br />pre-construction runoff levels. The applicant’s design professional shall evaluate the <br />project’s impact to the City’s storm drainage system and shall substantiate their <br />conclusions with drainage calculations to the satisfaction of the City Engineer. The <br />project shall be designed in conformance with the Drainage Guidelines for Residential <br />or Commercial Development. [SDR] [ENGINEERING] <br />14. Exterior Lighting – Provide a lighting plan for proposed exterior lighting, including cut <br />sheets, a photometric site plan demonstrating light levels and a diagram showing light <br />spillover. This information shall be included in the building permit plans. New light <br />sources must not introduce glare or light effects that spill off the property. <br />[COA][PLANNING] <br />15. Bicycle Parking – Provide at least 6 bicycle storage spaces, and demonstrate this on <br />the building permit plans. [COA][ENGINEERING] <br />8.A. - Page 33
The URL can be used to link to this page
Your browser does not support the video tag.