Laserfiche WebLink
ATTY/RESO.0048/CC RESO 612 JEFFERSON (HABITAT) APPEAL <br />REV: 05-15-17 VR <br />Page 14 of 22 <br />staff to discuss the inspection process and requirements for construction and site <br />work. The applicant shall arrange for the attendance of the owner, developer, <br />construction manager, contractor, and all subcontractors who are responsible for <br />grading and erosion and sedimentation protection controls. <br />51. Materials Mock-Up – Prior to final foundation inspection, prepare a mock-up that is <br />outdoors, readily accessible, and will remain intact until the project has reached <br />substantial completion. The mock-up should include all project colors and materials, <br />windows for the base and top, balconies, lighting, and architectural details, as well <br />as construction details, such as the weep screed, to understand how the design <br />addresses them. Then schedule a mock-up meeting with the Planning and Building <br />Departments for final review and approval of the project details. Submit an updated <br />colors and materials board or details if any changes are made as a result of the <br />mock-up meeting. [COA][PLANNING] <br />52. Construction Management and Staging - Prior to encroachment permit issuance, <br />submit a construction parking management plan, which shall outline the number of <br />construction workers by phase, phase duration, and where parking will be located for <br />each phase. A construction traffic plan, including the identification of truck haul <br />routes, shall also be submitted to and approved by the City. Construction, parking, <br />material storage, equipment, or other construction-related uses are not allowed within <br />the City right of way without prior approval from the City Engineer. <br />[COA][ENGINEERING] <br />53. Construction Noise Reduction Measures – The following noise reduction <br />measures shall be required throughout the course of construction: <br />1. Construction equipment shall be well maintained and used judiciously to be <br />as quiet as practical. <br /> <br />2. Ensure that all internal combustion engine-driven equipment is equipped with <br />mufflers that are in good operating condition and appropriate for the equipment. <br /> <br />3. Utilize “quiet” models of air compressors and other stationary noise sources <br />where such technology exists. <br /> <br />4. Locate stationary noise-generating equipment as far as reasonable from <br />sensitive receptors where sensitive receptors adjoin or are near a construction <br />project area. <br /> <br />5. Prohibit unnecessary idling of internal combustion engines in excess of five <br />minutes. <br /> <br />6. Route construction-related traffic along major roadways and as far as feasible <br />from sensitive receptors. <br /> <br />7. Ensure that construction activities, including the loading and unloading of <br />8.A. - Page 41