My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-06-12 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-06-12 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2017 11:00:53 AM
Creation date
6/8/2017 2:54:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/12/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ELF Financing Strategy <br /> San Mateo County ELF Study‐2016 <br />February 21, 2017 <br /> <br />Prepared by Brion Economics Team Final Report 6 <br /> <br />Table 3 summarizes the costs of meeting 100% of the unmet child care demand for children birth to <br />four years old in San Mateo County at 2015 and 2025. At 2025, there would be an estimated demand <br />for 1,454 new infant spaces and 8,762 new preschool spaces, or a total of 10,216 new ELF . As <br />discussed above, the average cost per space is $40,717 and the estimated cost to provide spaces to <br />meet all of the demand at 2025 is $416.0 million. An administrative cost of 3% ($12.5 million) is added <br />to the construction cost, for a total of $428.4 million. Assuming the total number of spaces is built over <br />10 years in equal increments, there would be 145 infant spaces and 876 preschool spaces built each <br />year, for a total of 1,022 annually. The annual cost for each year is estimated at $42.8 million. <br /> <br />$5.0 <br />$16.0 <br />$12.3 <br />$39.7 <br />$13.4 <br />$43.3 <br />$26.0 <br />$84.0 <br />$41.7 <br />$134.8 <br />$0.0 $20.0 $40.0 $60.0 $80.0 $100.0 $120.0 $140.0 $160.0 <br />New Employer‐Based Center ‐ 2015‐2025 <br />New Employer‐Based Center ‐ 2015 <br />New Portable Building ‐ 2015‐2025 <br />New Portable Building ‐ 2015 <br />Expanding Existing Center ‐ 2015‐2025 <br />Expanding Existing Center ‐ 2015 <br />Existing/New Comm. Space ‐ 2015‐2025 <br />Existing/New Comm. Space ‐ 2015 <br />Build New Center ‐ 2015‐2025 <br />Build New Center ‐ 2015 <br />(in millions $) <br />Figure 2: Total ELF Space Costs (in millions $) <br />8.C. - Page 25
The URL can be used to link to this page
Your browser does not support the video tag.