My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-06-26 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-06-26 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:53:14 PM
Creation date
6/22/2017 4:17:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/26/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
646
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0060/CC RESO AUTHORIZING ADOPTION OF SAN MATEO MUTUAL AID AGREEMENT EXHIBIT A REV: 06-15-17 RL Page 13 of 13 <br /> <br />Attachment A <br /> <br />San Mateo County Building Department <br />Checklist for Mutual Aid Assistance <br /> <br />I. Pre-Event <br /> <br />Develop procedures at the local operational area to carry out mutual aid including checklists <br />of actions, resource lists, etc. <br /> <br />II. Post Event <br /> <br />1. Local Agenc y quickly assesses estimated extent of damage and availability of <br />local resources to respond. <br /> <br />2. If it is apparent that outside resources will be needed to effectively deal with <br />the emergency, promptly authorize local official to request Proclamation of Local <br />Emergenc y and, if warranted, request State of Emergenc y Proclamation through the <br />Operational Area Emergenc y Operation Center. <br /> <br />3. Upon proclamation of local emergency, request mutual aid assistance from <br />Operational Area Building Department Mutual Aid Coordinator according to pre- <br />established procedures in WebEOC. <br /> <br />4. Ensure request is specific as to t ype and quantity of resources needed, when to report, <br />who to report to, how long needed, t ype of work to be performed. <br /> <br />Once a providing party can be located to satisfy the resource request, the coordinator <br />will determine how quickly these resources can be made available and notify the <br />requesting part y of that fact. <br /> <br />5. The requesting part y will make all necessary arrangements to care for the assisting <br />part y’s personnel and equipment if needed. <br /> <br />6. The requesting party will carefull y document all costs by specific damage site according <br />to State and Federal procedures to maximize reimbursement for costs. Carefully <br />record the names of assisting personnel and equipment at each site, hours worked, and <br />mileage. <br /> <br />7. The requesting part y should return the assisting party’s resources as soon as possible. <br />6.3.A. - Page 16
The URL can be used to link to this page
Your browser does not support the video tag.