My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-06-26 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-06-26 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:53:14 PM
Creation date
6/22/2017 4:17:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/26/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
646
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF REDWOOD CITY, CALIFORNIA <br />Cost of Services (User Fee) Study <br />Matrix Consulting Group Page 38 <br />the DC Fast Charging Station. It is important to note that the EV Charging Stations <br />hourly rate is similar to parking meter rates and are not subject to user fee regulations. <br />3. ANNUAL REVENUE IMPACT <br />The Public Works Department as it relates to its Utilities and EV Charging <br />Stations recovers approximately 99% of its costs or has a deficit of $1,000 annually. <br />The following subsections breakout the annual revenue impacts by Utilities and EV <br />Charging Stations. <br />(3.1) Utilities Annual Revenue Impact <br />As it relates to Utilities, the Public Works Department, over-recovers its fee- <br />related costs annually by $4,000. The following table shows for those fees that have <br />workload and volume data, the fee title, the amount processed, the revenue at current <br />fee, the total annual costs, and the associated annual surplus / (deficit). <br />Fee Name Volume5 Revenue at <br />Current Fee <br />Total Annual <br />Cost <br />Annual Surplus / <br />(Deficit) <br />5/8" 10 $1,500 $4,755 $(3,255) <br />¾” 1 $175 $508 ($333) <br />1" 40 $8,000 $22,786 ($14,786) <br />1.5" <br />Irrigation & Industrial 1 $350 $901 ($551) <br />2" <br />Irrigation & Industrial 7 $3,150 $9,164 ($6,014) <br />3" <br />Irrigation & Industrial 2 $4,1386 $4,138 $- <br />4" <br />Irrigation & Industrial 2 $7,1947 $7,194 $- <br />After Hours Turn On / Turn Off fee 2 $640 $782 $(142) <br />Cross-Connection Control <br />Backflow Administration 2061 $123,660 $81,246 $42,414 <br />Backflow Follow-up 360 $- $14,191 $(14,191) <br />Testing 35 $2,100 $1,700 $400 <br />Inspection 161 $8,050 $7,820 $230 <br />TOTAL $158,957 $155,185 $3,772 <br /> <br /> <br />5 For purposes of conservative revenue estimates the volume was coded to the cheapest meter type for the size of the meter. <br />6 As the current 3” meter is charged at actual cost the assumption is the revenue at current fee would match the full cost. <br />7 As the current 4” meter is charged at actual cost the assumption is the revenue at current fee would match the full cost. <br />7.A. - Page 50
The URL can be used to link to this page
Your browser does not support the video tag.