My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-06-26 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-06-26 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:53:14 PM
Creation date
6/22/2017 4:17:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/26/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
646
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment 1 <br />DWR Prop 84 – Local Project Sponsor Agreement – IRWM 2 – Redwood City – OWP 102244 <br />12 of 16 <br /> <br /> <br /> <br /> <br />This task consists of mobilization and site preparation including implementation of site <br />security measures, installation of temporary sanitary facilities, implementation of site <br />BMPs, clearing and grubbing, stockpile and material storage designation, and traffic <br />control. <br />Deliverables: <br />· Pre-construction photographs <br />Task 4 c) Project Construction <br />This task includes local flooding alleviation by routing flood flows from the Bayfront <br />Canal and Atherton Channel into managed ponds that are part of the Ravenswood <br />Pond Complex portion of the South Bay Salt Ponds Restoration Project. This task consists <br />of modification of the existing Cargill ditch for improved flow conveyance, <br />modifications to the Pond S5 forebay including excavation/deepening of this smaller <br />portion of Pond S5 immediately adjacent to Flood Slough, and routing of flood flows <br />from the Bayfront Canal into Ponds R5 and S5 of the Ravenswood Pond Complex, <br />thereby bypassing the Flood Slough tide gate. <br />Deliverables: <br />· Construction photographs <br />· Certified engineer inspection completion report with final as-built drawings <br />Task 4 d) Performance Testing and Demobilization <br />This task consist of project performance testing and demobilization, including removal <br />of all debris and construction spoils from the site, removal of excess materials, removal <br />of temporary sanitary facilities, removal of equipment, transfer of site responsibility back <br />to owner, and stormwater testing for contaminants and turbidity levels. <br />Deliverables: <br />· Post-construction photographs <br /> <br />Task 4 e) Environmental Compliance/ Mitigation/ Enhancement <br /> <br />This task consists of complying with general construction measures, and creating an <br />erosion and sediment control plan, stormwater pollution prevention plan, traffic control <br />plan, a hazardous materials management plan, and any environmental restoration <br />specifications. <br />Deliverables: <br />· A copy of the erosion and sediment control plan <br />· A copy of the stormwater pollution prevention plan <br />· A copy of the traffic control plan <br />· A copy of the hazardous materials management plan <br />· A copy of the environmental restoration specifications <br />Task 4 f) Construction Administration <br />6.1.D. - Page 16
The URL can be used to link to this page
Your browser does not support the video tag.