My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 4:18:31 PM
Creation date
6/28/2017 4:06:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 1: Mitigation Monitoring and Reporting Program <br /> <br />Impact <br /> <br />Mitigation Measures <br />Timeframe for <br />Implementation <br />Responsibility for <br />Implementation <br />Oversight of <br />Implementation <br />The existing building, common <br />items inside it, and existing <br />shed could contain lead-based <br />paints (LBPs), asbestos- <br />containing material (ACM), <br />polychlorinated biphenyl <br />(PCBs), and mercury. <br />HAZ-2: Hazardous building materials surveys shall be <br />conducted by a qualified and licensed professional for the <br />metal shed and the existing building. All loose and peeling <br />LBP and ACM shall be abated by certified contractor(s) in <br />accordance with National Emission Standards for <br />Hazardous Air Pollutants guidelines, Bay Area Air Quality <br />Management District, and Division of Occupational Safety <br />and Health (Cal/OSHA) requirements. All other hazardous <br />materials shall be removed from buildings prior to <br />renovation in accordance with applicable regulations. <br />Completion of the abatement activities shall be documented <br />by a qualified environmental professional(s) and submitted <br />to the City and/or San Mateo County for review with <br />applications for issuance of construction permits. <br />Prior to issuance <br />of construction <br />permits <br />Project Applicant Redwood City <br />Community <br />Development <br />Director <br />Source: LSA Associates, Inc., 2016 <br /> <br /> <br />ATTY/RESO.0032/PC RESO APPROVING CEQA - 860 CHARTER ST. EXHIBIT B <br />REV: 06-15-17 PR <br /> <br />Page 9 of 9
The URL can be used to link to this page
Your browser does not support the video tag.