My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 4:18:31 PM
Creation date
6/28/2017 4:06:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P:\RWC1401B Rocketship School\PRODUCTS\IS-MND\Public\Rocketship Public Review 09-29-16.docx (09/29/16) PUBLIC REVIEW DRAFT 17 <br />II. DRAFT MITIGATED NEGATIVE DECLARATION <br />Project Name: Rocketship Redwood City Elementary School Project <br /> <br />Project Location: The approximately 1.12-acre project site is located at 860 Charter Street in <br />Redwood City and unincorporated San Mateo County and is generally bounded by Bay Road to the <br />north, existing light industrial and commercial uses to the east and south, and Charter Street to the <br />west. <br /> <br />Description of Project: The existing project site is comprised of two immediately contiguous parcels <br />of land, one of which is located within the City of Redwood City and the other of which is located <br />within the County of San Mateo. The site is currently developed with an approximately 23,200- <br />square-foot, one-story warehouse structure within the City boundaries and an associated surface <br />parking lot and metal storage shed within the County boundaries. <br /> <br />The project sponsor (Launchpad Development Fifteen LLC/Rocketship Education) proposes to <br />convert the site into a public TK-5 charter elementary school, which would be operated by <br />Rocketship Education. Associated improvements include new landscaping and playground areas and <br />modifications to existing site access, circulation and parking. The proposed school would have a <br />maximum enrollment of 480 students when it is fully operational. <br /> <br />The proposed project also includes installation and operation of an active sub-slab depressurization <br />system to eliminate the exposure pathway between contaminated soil vapors and indoor air sensitive <br />receptors and inhibit soil gases from flowing into the building, thereby ensuring that indoor air <br />concentrations of VOCs related to the underlying subsurface conditions are reduced to an acceptable <br />level. Operation of this system would be conducted under DTSC oversight. <br /> <br />Findings: It is hereby determined that, based on the information contained in the attached Initial <br />Study, the project would not have a significant adverse effect on the environment. <br /> <br />Mitigation measures necessary to avoid or reduce the project’s potentially significant effects to a less- <br />than-significant level on the environment and are detailed on the following pages. These mitigation <br />measures are hereby incorporated and fully made part of this Draft Mitigated Negative Declaration. <br />The project sponsor has hereby agreed to incorporate as part of the project and implement each of <br />these identified mitigation measures, which would be adopted as part of the Mitigation Monitoring <br />and Reporting Program. <br /> <br /> <br />September 30, 2016 <br />Date Lisa Costa Sanders, Planner <br /> <br /> <br />ATTY/RESO.0032/PC RESO APPROVING CEQA - 860 CHARTER ST. EXHIBIT A <br />REV: 06-15-17 PR <br />Page 25 of 124
The URL can be used to link to this page
Your browser does not support the video tag.