Laserfiche WebLink
LSA ASSOCIATES, INC. <br />SEPTEMBER 2016 <br />ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br />INITIAL STUDY/ MITIGATED NEGATIVE DECLARATION <br /> <br /> <br />P:\RWC1401B Rocketship School\PRODUCTS\IS-MND\Public\Rocketship Public Review 09-29-16.docx (09/29/16) PUBLIC REVIEW DRAFT 50 <br /> Potentially <br />Significant <br />Impact <br />Potentially <br />Significant <br />Unless <br />Mitigation <br />Incorporated <br />Less Than <br />Significant <br />Impact <br />No <br />Impact <br />VIII. HAZARDS AND HAZARDOUS MATERIALS. <br /> Would the project: <br /> <br /> <br />d) Be located on a site which is included on a list of <br />hazardous materials sites compiled pursuant to <br />Government Code Section 65962.5 and, as a result, <br />would it create a significant hazard to the public or <br />the environment? <br /> <br /> <br />e) For a project located within an airport land use plan <br />or, where such a plan has not been adopted, within 2 <br />miles of a public airport or public use airport, would <br />the project result in a safety hazard for people <br />residing or working in the project area? <br /> <br /> <br />f) For a project located within the vicinity of a private <br />airstrip, would the project result in a safety hazard for <br />people residing or working in the project area? <br /> <br /> <br />g) Impair implementation of or physically interfere with <br />an adopted emergency response plan or emergency <br />evacuation plan? <br /> <br /> <br />h) Expose people or structures to a significant risk of <br />loss, injury or death involving wildland fires, <br />including where wildlands are adjacent to urbanized <br />areas or where residences are intermixed with <br />wildlands? <br /> <br /> <br /> <br />This analysis considers potential environmental impacts that could occur with implementation of the <br />proposed project, including those related to construction and operation of a sub-slab depressurization <br />system (SSDS) designed to address the potential presence of VOCs inside the project site structure; no <br />hazards impacts related to construction or operation of the SSDS were identified. <br /> <br />a) Create a significant hazard to the public or the environment through the routine transport, use, <br />or disposal of hazardous materials? (Less-Than-Significant Impact) <br /> <br />The proposed charter school would likely store a minor amount of hazardous materials associated <br />with cleaning compounds and other maintenance elements on the project site, as well as possible <br />science course-related chemicals. Handling, storage, and use of these hazardous materials and <br />disposal of any hazardous wastes would be required to comply with applicable laws and regulations. <br />Because of the small quantities involved and the regulatory requirements, the risk of upset and <br />accidental conditions involving the release of hazardous materials into the environment would be less <br />than significant. <br /> <br /> <br />ATTY/RESO.0032/PC RESO APPROVING CEQA - 860 CHARTER ST. EXHIBIT A <br />REV: 06-15-17 PR <br />Page 58 of 124