Laserfiche WebLink
Proposed Fees <br />A. ELECTRIC VEHICLE CHARGING FEE <br />$2.00/ hr <br />$5.00/ hr <br />$475.00 <br />$508.00 <br />$570.00 <br />i. Industrial/ Irrigation $901.00 <br />ii. Residential/ Commercial $1,567.00 <br />i. Industrial/ Irrigation $1,309.00 <br />ii. Residential/ Commercial $1,959.00 <br />i. Industrial/ Irrigation $2,069.00 <br />ii. Residential/ Commercial $2,490.00 <br />i. Industrial/ Irrigation $3,597.00 <br />ii. Residential/ Commercial $4,021.00 <br />iii. Fire Rated Master Meter $10,032.00 <br />i. Industrial/ Irrigation $6,188.00 <br />ii. Residential/ Commercial $6,830.00 <br />iii. Fire Rated Master Meter $12,432.00 <br />i. Industrial/ Irrigation $10,434.00 <br />ii. Residential/ Commercial $11,242.00 <br />iii. Fire Rated Master Meter $18,333.00 <br />Fees <br />1. Electric Vehicle Charging Level I & II Stations <br />2. Electric Vehicle Fast Charging Stations <br />B. WATER CONNECTIONS <br />1. Water Service Meter Fee - Meter and Installation (Meter type <br />determined by City Staff.) <br />h. 6" Meter Size <br />i. 8" Meter Size <br />a. 5/8" Meter Size <br />b. 3/4" Meter Size <br />c. 1" Meter Size <br />d. 1-1/2" Meter Size <br />e. 2" Meter Size <br />f. 3" Meter Size <br />g. 4" Meter Size <br />PUBLIC WORKS