Laserfiche WebLink
Exhibit A <br />Engineer's Estimate of Improvements <br />CITY OF REDWOOD CITY <br />CONTRACT BID WORKSHEET <br />NAME OF CONTRACT: Winslow Street Closure <br />Bid Opening Date: XXXXXXXXX <br />Bidder shall compute the Rem cost by multiplying the estimated quantity by the unit price <br />and shall enter the resulting figures in the "Item Cost" column to the nearest cent. In the <br />event of any discrepancy between the Item Cost as computed by bidder and the result of <br />multiplying the estimated quantity by the unit price, the result of multiplyng the estimated <br />quantity by the unit price shall control. <br />It is understood by bidder that the quantities stated below are estimated quantities and <br />are to be used as a basis for comparing bids only. <br />ENGINEER'S ESTIMATE <br />ITEM <br />NO. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />ll. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />18. <br />19 <br />20 <br />21. <br />22. <br />23 <br />24. <br />25. <br />26. <br />27. <br />28 <br />29 <br />30. <br />31. <br />EST. CITY. <br />I <br />I <br />I <br />I <br />I <br />19 <br />I 1,33 <br />I 1C <br />ITEM <br />LS Mobilization, Notification, and Incidentals <br />LS Prepare water pollution control program <br />EA to p rary damage inlet protection <br />LS snef sweeping <br />LS construction area signs <br />LS traffic control <br />LS Type III Barricade, Channelizers & Temporary Markings <br />LF remove concrete (curb and gutter) <br />SO FT remove concrete (sidewalk and island paving) <br />CY Roadwa. Excavation <br />EA Relocate Roadside Sign <br />EA Remove Son <br />EA New Parkin Meter <br />EA Adjust Utilover to Grade <br />CY Class 2 Aggregate Base <br />LF Minor Concrete (Curb and Gutter, Type C) <br />SOFT Minor Concrete (Sidewalk) <br />SOFT Minor Concrete )\Curb Ramp) <br />SOFT Detectable Wammg Surface <br />TON Hot Mix Asphalt (Type A) <br />EA Cap Drainsa Inlet <br />EA Storm Drainitet (D-8 Inlet <br />LF 12" Reinforced Concrete Pipe <br />EA Pipe cpgrVction Sp proposed or exist. Drain InkWManhole <br />CY <br />EA <br />TON <br />EA <br />LS <br />LF <br />SF <br />Roadside Sigqn & Panels <br />Rubberized Asphalt Concrete RAC Type G - 0.2' Overlay) <br />Adjust Utility Va�ve/Manhole to rade <br />Temp orarj�' tr�' in <br />Thermoplastic Trek Stripe and/or Pavement Markers <br />Thermoplastic Pavement Marking <br />TOTAL <br />UNIT PRICE TOTAL COST <br />$59,000.00 $59,000.00 <br />$2,800.00 $2,800.00 <br />$225.00 $1,800.00 <br />$1,250.00 $1,250.00 <br />$14,750.00 $14,750.00 <br />$43,659.00 $43,659.00 <br />$5,500.00 $5,500.00 <br />$15.50 $2,945.00 <br />$2.50 $3,325.00 <br />$108.50 $11,284.00 <br />$211.50 $423.00 <br />$250.00 $250.00 <br />$500.00 $500.00 <br />$237.50 $712.50 <br />$45.00 $1,170.00 <br />$43.50 $16,747.50 <br />$8.00 $19,040.00 <br />$12.50 $2,687.50 <br />$35.00 $3,850.00 <br />$240.50 $4,329.00 <br />$1,182.50 $1,182.50 <br />$3,766.50 $15,066.00 <br />$196.00 $20,580.00 <br />$555.00 $1,665.00 <br />$112.50 $562.50 <br />$252.50 $505.00 <br />$145.50 $5,092.50 <br />$522.50 $1,045.00 <br />$8,750.00 $8,750.00 <br />$0.78 _ $155.00 <br />$3.53 $705.00 <br />$251,331.00 <br />Redwood City's Oversignt Fee=10% ($25,133.10 <br />Contingency=l5% $37,699.65 <br />Total Bid Item Cost with 15% Contingency and RWC's 10% Oversight Fee $314,163.75 <br />ATTY/AGR.2017.121/PREMIA 550 OWNER, LLC - Agreement to Fund Required Improvements <br />