Laserfiche WebLink
6.3.C. - Page 85 <br />Task 3.15 Constructability Review <br />AECOM will participate in a Constructability Review at the 65% submittal. It is assumed <br />that the CITY and Caltrans will provide a representative to conduct the Constructability <br />Review. AECOM will coordinate the Constructability Review meetings. AECOM will <br />prepare meeting notes summarizing the action items and will adequately address the <br />comments generated by the review including providing explanation for comments not <br />incorporated into the design. <br />Task 3.16 Public Meeting Support <br />AECOM will provide support to the City by having one person attend a public meeting with <br />project exhibits and will provide talking points prior to the meeting. <br />Task 3 Delh,erables <br />■ Design Exception List (if required) <br />• Bridge Site Data Submittal <br />■ Type Selection Report <br />■ Right of Way Requirements <br />• Design Plan Sheets (65%) <br />• Edits and Modifications to the Special Provisions and NSSP's (65%) <br />• Final Design Reports (Refer to Task 2 for complete list of reports) <br />• Quantity Estimate <br />■ Construction Cost Estimate <br />• Construction Schedule <br />• RWQCB Water Quality Certification application <br />• Construction General Permit Compliance documents <br />Draft PS&E Forms <br />• Constructability Review Meeting Notes <br />• Public Meeting Exhibits and Talking Points <br />• Electronic files of plan sheets submitted <br />TASK 4 95% PS&E PHASE <br />Prior to making submittals of the 95% PS&E documents, AECOM will address the comments <br />received from the 65% submittal and incorporate them as appropriate. This will include <br />resolving them with Caltrans and its functional units, Caltrans' Engineering Services, the City, <br />and other reviewing agencies by attending up to 3 comment resolution meetings. AECOM will <br />provide written response to the 65% PS&E review comments, with justification noted for each <br />comment not incorporated. <br />Page 41 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />