Laserfiche WebLink
6.3.C. - Page 98 <br />ITEM No. of Conies <br />TASK 3 — 65% PS&E Phase <br />Design Exception List (if required) 20 <br />Bridge Site Data Submittal 10 <br />Type Selection Report 10 <br />Right of Way Requirements Electronic <br />Design Plan Sheets (65%) 50 sets of half-size <br />Edits and Modifications to the Special Provisions and <br />NSSP's (65%) 45 <br />Final Design Reports (Refer to Task 2 for complete list) 1 <br />Quantity Estimate 45 <br />Construction Cost Estimate 45 <br />Construction Schedule 45 <br />RWQCB Water Quality Certification application <br />2 printed, 1 CD <br />Construction General Permit Compliance documents <br />1 <br />Draft PS&E Forms <br />As Needed <br />Constructability Review Meeting Notes <br />email distribution <br />Public Meeting Exhibits <br />As Needed <br />Electronic files of plan sheets submitted <br />Electronic <br />TASK 4 — 95% PS&E Phase <br />Design Exception Fact Sheets 10 <br />50 sets of half-size and <br />Design Plan Sheets 1 CD of CADD Files <br />Special Provisions 45 <br />Design reports not previously approved 10 <br />Permit Application and Permit 15 <br />Quantity Estimate 45 <br />Page 54 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />