My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-07-24 Closed and Joint SA FPA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-07-24 Closed and Joint SA FPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:52:47 PM
Creation date
7/20/2017 4:36:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
7/24/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3.C. - Page 104 <br />Street, Blomquist Street (800 feet from Seaport Boulevard), and East Bayshore Road <br />(1400 feet from Seaport Boulevard). <br />• The Biological Study Area identified in the Natural Environment Study (URS, October <br />2015) and the Area of Potential Affect identified in the Archaeological Survey Report <br />(URS, August 19, 2015) represents the maximum extent of project activities/access. <br />Proiect Mana ament <br />■ Project management activities are provided for a 29 -month period starting from Notice to <br />Proceed. <br />• The PS&E Submittals will include 65%, 95%, 100% and Final. A 35% Submittal is not <br />expected or planned. <br />• This scope assumes a single highway construction bid package. Should it become <br />necessary to split the PS&E package into two bid packages, AECOM will submit a <br />separate scope and fee for the additional effort required. <br />• Public Outreach, Public Meetings and Community Meetings are not included except as <br />identified within the Scope of Services. <br />R:ight of Entry <br />* Encroachment permit applications to perform design activities within Caltrans and City <br />right of way will be prepared by AECOM for the City's signature. AECOM will not be <br />responsible for permit application fees. All permits fees will be paid by the City. <br />+ Obtaining private property right of entry will be the responsibility of the City (as noted <br />above). <br />Materials and Information provided by others <br />• Relevant data from previous/ongoing studies in the project area <br />• Utility record drawings <br />• As -built construction plans <br />• Right-of-way record maps <br />• Survey controls <br />• Log of Test Borings, Foundation Reports, Foundation Reviews, and field records of pile <br />driving logs for the construction of existing structures. <br />Manning <br />• Aerial topo mapping has been completed for the project in English units and this is <br />sufficient for the project needs. During the design process, the mapping will be enhanced <br />by field surveys. <br />Units <br />* All project deliverables will be prepared in English units. <br />Page 60 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />
The URL can be used to link to this page
Your browser does not support the video tag.