Laserfiche WebLink
6.1.D. - Page 22 <br />D. TIME SCHEDULE <br />The following is the consultant's summary of the [AR1]work schedule for the project <br />up to Task 7. A different time schedule will be needed if proceed with Task 8 and/or <br />Task 9. <br />Task Name <br />Notice To Proceed <br />Surveying and Utilities Research <br />Basis of Design Technical Memorandum <br />75% Design Submittal <br />95% Design Submittal <br />100% Design Submittal <br />Bid Support and Construction Services <br />Start Finish <br />7/31/17 <br />8/4/17 8/25/17 <br />8/4/17 9/5/17 <br />9/18/17 10/11/17 <br />10/25/17 11/20/17 <br />12/6/17 1/8/18 <br />1/29/18 12/21/18 <br />The Consultant's detailed presentation of their [AR2]project work schedule is shown <br />on Exhibit B. <br />E. COMPENSATION <br />Consultant shall perform the Scope of Work described for a fixed fee of One <br />Hundred -Ninety Five Thousand and 00/100 Dollars ($195,000.00). Consultant shall <br />be compensated per percentage of work accomplished [AH3]at the end of the month <br />payable within thirty (30) days following City's receipt of acceptable deliverables. <br />Consultant's detailed breakdown of their level of effort and fees is shown on Exhibit C. <br />ATTY/AGR/2017.149/HYDROSCIENCE ENGINEERS, INC. <br />REV: 06-30-17 PR <br />Page 18 of 20 <br />