My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Streetline
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Streetline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2017 8:49:58 AM
Creation date
7/24/2017 8:49:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Streetline
PROJECT NAME
Smart Parking Program
RMP File Number
304.5
Date
7/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
streetlamps and require a continuous line power source (120 or 240v, 50 or 60 Hz) that must be <br />provided by the Customer. <br />Documentation <br />• High-level project plan for installation, evaluation and completion <br />• Application instructions and training materials <br />Streetline Responsibilities <br />Network & Sensor Installation, Training & Support, Project Reporting <br />• Develop mutually agreed upon sensor and Network Equipment deployment plan ("Network <br />Plan") with Customer <br />• Install all Equipment in accordance with Network Plan <br />• Provide initial training in use of applications <br />• Maintain and repair, as necessary, all Equipment necessary for Customer to use the Service as <br />set forth in this Agreement <br />• Provide Customer with access to all data generated and/or derived from the Equipment, Service, <br />or customer -provided data as set forth in this Agreement <br />• Promptly notify Customer of system outages or downtime <br />• At end of Term, provide Executive Summary report highlighting program results and showing <br />potential Improvements achievable by deploying smart parking system on broader scale <br />• Remove Equipment at end of Term, with the exception of parking sensors which can remain in <br />place <br />• Provide Customer with access to the data through an application program interface(api) <br />Customer Responsibilities <br />• All required permissions and permits granting installation permission to Streetline shall be at no <br />cost to Streetline <br />• Arrange for street closures and applicable sign postings <br />• Arrange for continuous power for gateway(s) through an acceptable source (120 or 240v, 50 or <br />60 Hz) at a location (or locations) in accordance with Network Plan <br />• Cooperate with Streetline In establishing metrics and providing necessary benchmark data for <br />Streetline's Executive Summary report <br />• Use best efforts to notify Streetline 10 business days prior to scheduled road paving or slurrying <br />activity of areas with sensors <br />• Promptly notify Streetline of any power interruption to gateways or removal of repeaters or <br />gateways by Customer's maintenance crews <br />• Customer may, in its sole and absolute discretion, acknowledge on the Customer's website, <br />social media platforms or in other Customer media, that it uses Streetline's Service <br />• In its sole and absolute discretion, Customer may provide machine readable parking policy <br />information to Streetline <br />• In its sole and absolute discretion, Customer may, provide machine readable parking space <br />REV; 07-07-1715 <br />ATTY/AGR.2017.158/Streetline Page 6 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.