My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt95 Winges Architecture
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1995
>
Agmt95 Winges Architecture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:29:51 PM
Creation date
11/9/2004 9:13:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Winges Architecture
PROJECT NAME
Redwood Shores satellite maintenance
RMP File Number
304
Date
9/18/1995
Reso Ref
12593
Box
5860
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> EXHIBIT "A" <br /> Redwood City Fee Estimate <br /> Redwood Shores Satellite Maintenance Facility <br /> hours avg. subtotal <br /> bill rate item <br />Research & General Reauirements: <br />Create new computer base drawing-site 8 $55.00 440 <br />Code interpretations/solutions/approvals: 4 $78.00 312 *no BCDC or Army Corp. included <br />Meetings/Project Management-all phases 40 $88.00 3,520 <br /> subtotal General: $4,272 52 hours <br />Schematic Desian/Desian Development <br />Schematic Design studies/drawings 80 $63.00 5,040 <br />Produce drawings for "35%" review set: 40 $58.00 2,320 <br /> subtotal DD: $7,360 120 hours <br /> hours avg. subtotal <br />Construction/Bid Documents: sheet bill rate item <br />(preliminary list) <br />T-1 Title Sheet/Location Sheet 8 $58.00 464 <br />A-1 Site Plan/Roof Plan 1"=20' 30 $58.00 1,740 <br />A 1.1 Site Details 40 $58.00 2,320 <br />A·2 Floor Plan 1/4" 36 $63.00 2,268 <br />A-3 Reflected Ceiling Plan 25 $58.00 1 ,450 <br />A-4 Door sched./Finish Sched. /dets 30 $72.00 2,160 <br />A·5 Elevations 30 $58.00 1,740 <br />A-6 Bldg. Sections/Wall sections/Criteria. 30 $58.00 1,740 <br />A-7 Interior elevations-toils/lockers 30 $63.00 1,890 <br />A-8 Details 40 $63.00 2,520 <br />Specifications: <br />Material selections--building system reasearch 10 $78.00 780 <br />Technical specifications 24 $78.00 1,872 <br /> SubTotal CD: $20,944 333 hours <br />Consultants: their $ multiplier total <br />Structural engineering: Oak 3,500 1.15 $4,025 <br />Electrical engineering: SCE 2,500 1.15 $2,875 <br />Mechanical engineering: JBM 3,100 1.15 $3,565 <br />Civil Engineer: McLeod Associates 4,000 1.15 $4,600 <br />Cost consulting: Cromb 1,500 1.15 $1 ,725 <br />Landscape Design (to be selected) 1,500 1.15 $1,725 <br /> subtotal Consultants: $18,515 <br />Biddina Phase: <br /> Questions, Negotiations/award/Addenda: <br /> allow: 12 $78.00 $936 <br /> Subtotal Through bidding: $52,027 <br /> 505 hours <br /> Page 1 <br /> -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.