Laserfiche WebLink
Exhibit Table B (1)-2 <br />NOT TO EXCEED FEE SUMMARY <br />(1) Design of Custom Structure Aesthetics <br />DIRECT LABOR <br />Principal -In -Charge <br />Project Manager <br />Sr. Project Engineer <br />Sr. Bridge Engineer <br />Total Direct Labor <br />Labor Escalation (6 months assumed) <br />Total Direct Labor (escalated) <br />Overhead <br />Fee <br />Total Labor <br />SUBCONSULTANTS <br />Haygood & Associates <br />Subtotal Subconsultants <br />Markup <br />Total Subconsultants <br />EXPENSES <br />Misc. Printing <br />Postage, Travel, Misc. <br />Subtotal Expenses <br />Markup <br />Total Expenses <br />TOTAL PROJECT COST <br />Hours <br />Rate <br />Total <br />0 <br />140.00 <br />$0.00 <br />8 <br />96.50 <br />$772.00 <br />4 <br />82.00 <br />$328.00 <br />12 <br />84.00 <br />$1,008.00 <br />24 <br />$2,108.00 <br />0.000% <br />$0.00 <br />$2,108.00 <br />135.09% <br />$2,847.70 <br />10% <br />$495.57 <br />$5,451.27 <br />301 $54,782.00 <br />$54,782.00 <br />2% $1,095.64 <br />$55,877.64 <br />$10.00 <br />$90.00 <br />$100.00 <br />0% $0.00 <br />$100.00 <br />Note: Position rates are an anticipated average for each position category <br />Specific rates are determined by actual salary at time of service <br />Rate differences do not affect the total not to exceed contract amount. <br />REV: 07-03-19 DZ <br />ATTY/AGR.Amend No. 3/AECOM 101184 PS&E Page 9 of 13 <br />$61,428.91 <br />