Laserfiche WebLink
estimates and tables will be MS Excel 2010. If files are converted, the conversions will be <br />performed to the satisfaction of the City and Caltrans requirements. <br />6.0 LIST OF POTENTIALLY AFFECTED PROPERTIES <br />Below is a table from the Final Environmental Document, dated December 2016 on the <br />project that indicates proposed permanent right-of-way changes and temporary construction <br />easements. Task 7 Right of Way Support makes reference to this table. <br />Potential Properties to be Included into the Rightof-Way, and Appraisal Map Requirements2 <br />No. I APN Address Type of Development Type of Property Requirement <br />1 1052-392-060 340 Blomquist St Proposed mixed use: <br />Harbor View <br />2 052-392.480 <br />3 052-392-999 <br />4* 1052-392-370 <br />15 Stein Am Proposed mixed use: <br />Rhein Ct Harbor View <br />NA PG&E Substation <br />19 Seaport Blvd I Industrial: Lyngso <br />TCE; permanent easement for I0 -foot setback <br />from right-of-way to accommodate retaining <br />wall. No change to structures or parking. <br />TCE <br />TCE <br />TCE; partial acquisition along Blomquist St <br />frontage (approximately 30 feet). No change to <br />structures; potential removal of a small number <br />of parking places. <br />Commercial: Smart & TCE; partial acquisition along Broadway <br />1 I • 054-022-060 1185 Broadway Final frontage (approximately 6 feet). No change to <br />structures or parking. <br />Page 57 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />Commercial: U.S. Postal TCE; partial acquisition along Broadway <br />9• 054-023-060 <br />1100 Broadway Service frontage (approximately 6 feet). No change to <br />TCE; partial acquisition along Blomquist St <br />5* <br />052-392-280 <br />410 Blomquist St <br />Industrial: Flyers Gas <br />frontage (approximately 30 feet). No change to <br />Station <br />structures; potential removal or relocation of <br />two gas pumps. <br />6 <br />( 054-310-160 <br />NA <br />Other: Salt crystallizer bed <br />I TCE <br />7 <br />054-040-330 <br />11089 Mills Way <br />Industrial <br />I TCE <br />Commercial: 24 Hour <br />TCE; partial acquisition of shoulder area along <br />8* <br />054-023-080 <br />1050 Broadway <br />Fitness <br />southbound US 101 on-ramp. No change to <br />structures or parking. <br />Commercial: Smart & TCE; partial acquisition along Broadway <br />1 I • 054-022-060 1185 Broadway Final frontage (approximately 6 feet). No change to <br />structures or parking. <br />Page 57 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />Commercial: U.S. Postal TCE; partial acquisition along Broadway <br />9• 054-023-060 <br />1100 Broadway Service frontage (approximately 6 feet). No change to <br />structures or parking. <br />10 054-023-070 <br />Redwood City CA Infrastructure: Pump TCE; partial acquisition along Woodside <br />Road/Broadway comer. Potential relocation of <br />94063 Station <br />fence and utility cabinet. <br />Commercial: Smart & TCE; partial acquisition along Broadway <br />1 I • 054-022-060 1185 Broadway Final frontage (approximately 6 feet). No change to <br />structures or parking. <br />Page 57 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />