My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-11-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-11-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:32:08 PM
Creation date
11/18/2004 12:58:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
11/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 5 I C-2 <br />* Pacific Infrastructure Corp. retracted its low bid of $368,000.00, citing a mistake in <br /> entering a bid amount that made the bid materially different. As a result, Bamer <br /> Construction Co. is the lowest responsible bidder. <br />Alternative <br />Do not award the contract and re-bid the above-mentioned project. This will delay the <br />much needed improvements to the pump stations. <br />Fiscal Impacts <br />Funds in the amount of $463,851.14 are available in the Seaport Centre Maintenance <br />District Fund, for this project. <br />~~ rJ-¡~ ~ ~ þ./"" ~ <br />Grate Le ~el Patferson Ed Everett <br />Assistant Engineer II anager, Engineering & Construction City Manager <br />GLlSPV:ss <br />S/librarylreportslawarcl SP Centre Levee Repair <br /> - ~ <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.