Laserfiche WebLink
0 2,5001,250 <br />Scale in Feet <br />FIGURE 6-22 <br />City of Redwood City <br />Water System Master Plan <br />CAPITAL IMPROVEMENTPROJECTS, HILLSIDE AREA <br />!( <br />#* <br />#* <br />#* <br />#* <br />#* <br />#* <br />!!2 <br />!!2 <br />!!2 <br />!!2!!2 <br />!!2 <br />UT <br />!( <br />!( <br />!(!( <br />!( <br />!(!(¼ÐÚ <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />Wilmington PS <br />Residential <br />Hillside <br />Carson PS <br />Glenloch PS <br />Edgewood PS <br />Lakeview PS <br />Cambridge PSCalifornia PS <br />Glenloch ST <br />Lakeview ST <br />Cambridge ST <br />Wilmington ST <br />Easter Bowl ST <br />Easter Cross ST <br />LEGENDCapacity and Reliability Program <br />UT Storage Tank - CAP-1 <br />""!Ú Pump Station - CAP-1 <br />!!2 Regulator - CAP-1 <br />!!2 Regulator - CAP-2 <br />Pipelines - CAP-1Pipelines - CAP-2Pipeline and Facility Replacement ProgramPRP-1PRP-2 <br />#*FRP-1 <br />#*FRP-2 <br />Seismic Improvement Program <br />!(SIP-1 <br />!(SIP-2 <br />!(SIP-3 <br />Focus Area <br />Capacity and Reliability Program:CAP-1: 0.75 MG California Tank, Pump Station and Pipeline New Generator at Cambridge PS New Regulators at Wilmington and Glenloch Tanks 1,600 ft of pipeline improvements for fire flowCAP-2: 15,400 ft of pipeline improvements for fire flow <br />Pipeline and Facility Replacement Program:PRP-1: 5,700 ft of pipeline improvementsPRP-2: 28,600 ft of pipeline improvementsFRP-1: Rehabilitate Cambridge PS, Carson PS, and California PSFRP-2: Rehabilitate Edgewood PS and Glenloch PS Steel Tank Recoating Project Wilmington Tank Replacement <br />Seismic Improvement Program:SIP-1,-2,-3 at Multiple Tank and Pump Station Sites <br />For clarity, long-term programs (CAP-3, PRP 3 through 7, FRP-3 and SIP-4) not shown <br />O:\Clients\369 City of Redwood City\06-09-01 Water System Master Plan\GIS\Figures\Figure 6-22_CIP_Hillside_Area.mxd <br />6.1.F. - Page 27