My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-08-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-08-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 9:41:44 AM
Creation date
8/24/2017 2:54:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
8/28/2017
Jump to thumbnail
< previous set
next set >
Callout
ID:
1
Creator:
Created:
8/24/2017 3:02 PM
Modified:
8/24/2017 3:02 PM
Text:
Proposed California Water Storage Tank, Pump Station, and Pipelines.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 2,5001,250 <br />Scale in Feet <br />FIGURE 6-22 <br />City of Redwood City <br />Water System Master Plan <br />CAPITAL IMPROVEMENTPROJECTS, HILLSIDE AREA <br />!( <br />#* <br />#* <br />#* <br />#* <br />#* <br />#* <br />!!2 <br />!!2 <br />!!2 <br />!!2!!2 <br />!!2 <br />UT <br />!( <br />!( <br />!(!( <br />!( <br />!(!(¼ÐÚ <br />!( <br />!( <br />!( <br />!( <br />!( <br />!( <br />Wilmington PS <br />Residential <br />Hillside <br />Carson PS <br />Glenloch PS <br />Edgewood PS <br />Lakeview PS <br />Cambridge PSCalifornia PS <br />Glenloch ST <br />Lakeview ST <br />Cambridge ST <br />Wilmington ST <br />Easter Bowl ST <br />Easter Cross ST <br />LEGENDCapacity and Reliability Program <br />UT Storage Tank - CAP-1 <br />""!Ú Pump Station - CAP-1 <br />!!2 Regulator - CAP-1 <br />!!2 Regulator - CAP-2 <br />Pipelines - CAP-1Pipelines - CAP-2Pipeline and Facility Replacement ProgramPRP-1PRP-2 <br />#*FRP-1 <br />#*FRP-2 <br />Seismic Improvement Program <br />!(SIP-1 <br />!(SIP-2 <br />!(SIP-3 <br />Focus Area <br />Capacity and Reliability Program:CAP-1: 0.75 MG California Tank, Pump Station and Pipeline New Generator at Cambridge PS New Regulators at Wilmington and Glenloch Tanks 1,600 ft of pipeline improvements for fire flowCAP-2: 15,400 ft of pipeline improvements for fire flow <br />Pipeline and Facility Replacement Program:PRP-1: 5,700 ft of pipeline improvementsPRP-2: 28,600 ft of pipeline improvementsFRP-1: Rehabilitate Cambridge PS, Carson PS, and California PSFRP-2: Rehabilitate Edgewood PS and Glenloch PS Steel Tank Recoating Project Wilmington Tank Replacement <br />Seismic Improvement Program:SIP-1,-2,-3 at Multiple Tank and Pump Station Sites <br />For clarity, long-term programs (CAP-3, PRP 3 through 7, FRP-3 and SIP-4) not shown <br />O:\Clients\369 City of Redwood City\06-09-01 Water System Master Plan\GIS\Figures\Figure 6-22_CIP_Hillside_Area.mxd <br />6.1.F. - Page 27
The URL can be used to link to this page
Your browser does not support the video tag.