My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Waterworks Industries, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 Waterworks Industries, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:45:21 PM
Creation date
9/7/2017 2:44:57 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Waterworks Industries, Inc.
PROJECT NAME
Redwood Shores Lagoon Aquatic Plant Management
RMP File Number
304
Date
9/7/2017
MO Ref
17-153, 18-028
Link Groups
Link
1:
Agmt17 Waterworks Industries, Inc
Last modified:
9/10/2020 3:45:21 PM
Path:
\City Clerk\Agreements\2010-2019\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A' <br />I. SCOPE OF SERVICES <br />Consultant shall provide the following services from April 1, 2017 to September 7, 2017: <br />a. Mechanical Harvestine. Following the draft Lagoon Management Plan: Redwood Shores <br />Lagoon, July 2003, as amended identify needs, set schedules, notify and advise the City <br />on recommended mechanical harvesting. Provide skilled staff, equipment and materials <br />to cant' out work safely and pursuant to County, State and Federal laws. <br />b. Chemical ADDlications. Following the draft Lagoon Management Plan: Redwood Shores <br />Lagoon, July 2003, and any amendments thereof with the exception of the use of the <br />copper -based algaecides EarthTec, AgriTec and Cutrine-Plus, identify needs, set <br />schedules, notify and advise the City of recommended algaecide and herbicide <br />treatments. Quickly process the needed changes to amend the current Aquatic Pesticide <br />Application Plan (APAP) to include Green Clean Liquid 2.0 (only Green Clean Liquid <br />2.0, as no granular versions will be allowed due to lack of efficacy on filamentous algae) <br />to the approved list of algaecides available for use on Redwood Shores lagoon and have it <br />approved by the State and Regional Water Quality Control Boards. Provide state licensed <br />and / or certified skilled staff, equipment and chemicals to carry out work applications <br />safely and pursuant to County, State and Federal laws and to be able to. Specify narne(s) <br />of the registered pesticide applicator(s) that will perform chemical application activities. <br />C. Equipment. Dedicate the following equipment to the project for the term of the <br />agreement: A minimum of two (2) aquatic harvesters are required to be dedicated for the <br />duration of the project to assist in aquatic weed and algae removal. Provide contingency / <br />back up plan to ensure continual service to Redwood City, particularly during the high <br />plant growth period, in the event of equipment failure or maintenance. <br />II. PAYMENT TERMS <br />A. Pavment Terms: Consultant shall provide the services outlined below on an hourly <br />and per task basis, not to exceed annual authorized amounts. Fees will be billed <br />monthly based on the actual hours o r t a s k used in each phase, per the labor rate <br />schedule as delineated in <br />Section B. <br />REV: 02-08-18 MI <br />Page 3 of 4 <br />AM/AGR.Amend No. IMaterworks Industries. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.