My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 38 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> Primary access to the main parking lot used for student drop-off and pick-up would be provided via <br /> two driveways,one each on Charter Street and Bay Road. Both driveways would be 24 feet wide. <br /> During the peak hours immediately before and after school,the driveway on Charter Street would be <br /> an inbound-only driveway,and the driveway on Bay Road would be an outbound-only driveway <br /> (labeled lanes A and B on Figure 7). School staff would be positioned at each driveway to restrict <br /> traffic entering and exiting these driveways to right turns only during these hours. The loading zone <br /> would begin on the south side of the crosswalk and extend for a distance of approximately 110 feet in <br /> lane A and 92 feet in lane B. Staff would be positioned at the crosswalk to ensure pedestrian safety <br /> and to direct vehicle traffic. Vehicles would be directed to proceed into the designated loading area in <br /> groups(five vehicles in lane A and four vehicles in lane B)when the previous vehicles have cleared <br /> the loading zone. Support staff would then escort children between their vehicles and the designated <br /> walking path that leads to the indoor cafeteria. The total loading area provided would be 202 feet.No <br /> student activity would be permitted in the outdoor play area during drop off and pick up times.All <br /> students would remain indoors. During off-peak periods,the Charter Street driveway would be fenced <br /> and the Bay Road driveway would serve both inbound and outbound traffic. <br /> Building entrances would be located at the rear of the building,along the Charter Street frontage,and <br /> at the front of the building.After 8:00 a.m.,all building entrances would be locked,with the <br /> exception of the entrance on Charter Street.Visitors,delivery,and service personnel would have to <br /> check-in with administrative staff before being allowed into the interior of the building,or anywhere <br /> on campus where the kids are accessible including the outdoor play space. <br /> Short-term traffic during drop-off(morning)and pick-up(afternoon)would be managed by on-site <br /> staff,with scheduled arrival/departure times by grade for students.Afternoon pick-up would be <br /> staggered between 2:00 p.m. and 7:00 p.m.,according to the schedule described above. <br /> A total of 36 staff and visitor parking spaces would be provided at the front and rear of the building, <br /> with access from Charter Street and Bay Road. Vehicle parking would be accommodated by 20 <br /> spaces in double stacked parking lifts, 5 standard spaces, 1 compacts space,and 2 van accessible <br /> spaces in the main(east)parking lot,and 8 compact spaces in the western parking lot. <br /> 5. Utilities and Infrastructure <br /> The project site is located in an urban area and is currently served by existing utilities,including: <br /> water, sanitary sewer, storm drainage,electricity,and telecommunications infrastructure. <br /> Existing infrastructure within Charter Street includes a 12-inch water line,an 8-inch sanitary sewer <br /> line,and a 48-inch storm drain. An existing 2-inch water line would be utilized to connect to the main <br /> water line and a new 6-inch sewer line would be installed to connect to the main line. A new 12 <br /> kilovolt(kv)transformer vault would be installed at the rear of the building adjacent to Charter Street <br /> and would provide a connection between an existing nearby 12kv utility pole and a new electrical <br /> room at the rear of the building. <br /> The project sponsor also intends to implement energy conservation measures and green building <br /> techniques. For example,the remodeled building would include interior and exterior LED lighting <br /> with continuously dimmable ballasts,a feature that automatically adjusts the brightness when there is <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 14 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 22 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.